Laserfiche WebLink
PW OCOG)4-c zu <br />Milbor-Pita <br />&SSOCIATES, INC. <br />21 Dec99 <br />SC130 <br />7immer Gunsul Frasca Partnership <br />1191 Second Avenue, Suite 800 <br />Seattle, Washington 98101 <br />Attention: Mr..Don Miles, Project Manager <br />RE: Addendum #1: Subsurface Exploration and Geotechnical Engineering <br />Report for the Everett Transit Intermodal Transportation Center, Everett, <br />Washington <br />Introduction <br />In a meeting held '.n early December at Inca Engineer's office, the following questions <br />were asked concerning the geotechnical recommendations. <br />• What was the pavement section design of existing Smith Ave. and 32/33 d <br />Streets and why have they performed so well? <br />• Could the initial overexcavation and backfill recommendations be eliminated <br />if the pavement section recommendations were altered? <br />• What is the lateral foundation design recommendations for. traffic. signals <br />poles proposed for the project? <br />• Should the large flower bed areas be drained from below? <br />• What is the probable dovnidrag effect from the bridge embankment fill on an <br />existing pipeline? <br />This addendum focuses on these issues only. This brief report should be used in <br />conjunction with the earlier Milbor-Pita & Associates, Inc. report dated 25Aug99. <br />Background <br />To answer the above questions, more data was required over the entire project site. This <br />data needed to be focused on the upper near surface; soils. The previous borings did evaluate <br />the overall geologic conditions of the site, but did not obtain enough specific data on the <br />upper 5 feet of the site's existing soil. <br />Also, no data was available on the pavement thickness or the soil conditions immediately <br />beneath die existing pavement sections at or near the site. As a result, the field investigation <br />was structured so that data could be obtained in these areas. <br />El <br />xploration <br />stsx ra n (NCE), a ilbor-Pita su ntractor performed cone <br />r t ( te, projects� n December 13 <br />1 ns s town on Figure A-l. Access at t e site was good. <br />Geoteclmical, Tunnel and Environmental Engineers <br />3080 1256' Ave NP Phone (425) 869-57'.8 <br />ncllewe, WA 98005 Prge I Pax (425) 861-0677 <br />