Laserfiche WebLink
sc 130 Milbor-Pita <br />5.4 Temporary Excavations and Shoring <br />15 <br />5.5 Utility Installation Considerations <br />16 <br />5.6 Wall Lateral Loads & Drainage <br />16 <br />5.6.1 Wall Loadings <br />16 <br />5.6.2 Wall Drainage Considerations <br />16 <br />5.7 Pavement Considerations <br />17 <br />5.7.1 General Considerations <br />17 <br />5.7.2 Automobile Parking Lot Areas <br />- Asphalt Parking Lot Areas Asphalt <br />17 <br />5.7.3 Bus Areas — Concrete <br />18 <br />5.8 Site Drainage and Erosion Considerations <br />18 <br />5.8.1 Surface Water Control <br />18 <br />5.8.2 Erosion Control <br />18 <br />6.0 CLOSURE <br />19 <br />7.0 REFERENCES 20 <br />List of Figures (following text) <br />Figure I Vicinity Map <br />Figure 2 Site Map <br />Appendices (following text) <br />Appendix A: Boring Logs MP-1 through MP-6 <br />Appendix B: Boring Logs by Others <br />Appendix C: Geotechnical Laboratory Data Classification Tests <br />Appendix D: Geotechnical Laboratory Data Consolidation Test Results Summary & <br />Raw Data <br />Geotechnical, Tunnel and linvimnmentel Fngin=s <br />3080 125' Ave Nr Phone (425) 869-5778 <br />Bellevue, WA 98005 Fax (425)961-0677 <br />