Laserfiche WebLink
Geotechnical Addendum — ►iverett Intermodal Station <br />Photo 4: Six cores obtained from <br />P. l Smith Ave. All cores are full -depth <br />ashpalt and approximately 8 inches in <br />thickness (from Icft to right; core-C to <br />core-1). <br />R <br />Photo 5: Two 4 inch thick asphalt <br />cores on left are from 32nd Street <br />(core/cones A & B). Core on right is <br />concrete pavement, 6 inches thick and <br />located in Paine Ave. (core/cone-F). <br />Photo 6: Cut in 33rd Street used to lo- <br />cate the pipeline. Note substantial <br />thickness of asphalt. <br />S \lilhor-Pita, Inc. <br />Geotechnical, Tunnel & linvironment:l Consultants <br />