Laserfiche WebLink
CITY OF EVERETT <br />DEPARTMENT OF PUBLIC WORKS <br />UTILITIES DIVISION <br />UTILITY WORK ORDER <br />Date: 5'" �) ��� ?"WATER <br />r <br />❑ SEWER <br />❑ STORM <br />Location: <br />W.O. Instructions: <br />ESTIMATED <br />_z-mRD <br />>. <br />$46T <br />W.O. No. <br />r L 30 29-� Acct. No. L.-� ) t y <br />Complaint No. _ <br />SERVICE <br />I� MAINTENANCE <br />MAIN <br />❑ OPERATION <br />❑ <br />PUMP STATION <br />REPAIR <br />❑ <br />TREATMENT <br />❑ CONSTRUCTiON <br />❑ <br />RESERVOIR <br />❑ <br />VALVE <br />❑ <br />MAN HOLE <br />❑ <br />CATCH BASIN <br />-�~- <br />❑ <br />DITCH <br />eVPA-i e <br />'41 /) I <br />ACTUAL <br />Labor (hours) Labor (hours) <br />Material (cost) Material (cost) <br />Equipment (cost) Equipment (cost) <br />"SCHEDULING REQUESTED <br />USE CHARGE ACCOUNT NUMBER BELOW FOR LABOR TIME SLIPS. ITEMIZE <br />LABOR, EQUIPMENT, AND MATERIALS ON REVERSE SIDE. <br />Completion (Date): Cost:$ <br />Charge`Account Number: Charge Cost To (Name): <br />i, <br />Address: <br />Invoice No.: _Amount:$ Date: <br />1/85 <br />