My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1308 34TH ST 2016-01-01 MF Import
>
Address Records
>
34TH ST
>
1308
>
1308 34TH ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 11:56:10 PM
Creation date
4/1/2017 3:53:37 PM
Metadata
Fields
Template:
Address Document
Street Name
34TH ST
Street Number
1308
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 1 I, �G�2 <br />Jeti Heilman <br />Development Technician <br />Everett Public Works <br />RE: Owner: Sandstrom <br />Job Address: 1308 34'�' Street <br />Plan Check No.: CO206-023 <br />Uear Mr. Heilman, <br />In response to the corrections you requested f'or the issuance of a building permit, I have <br />prepared the tollowing letter to address the revisions you oudined. The plan locations of your <br />required corrections, numbers 1-9, are listed below. <br />See page S, West View Section (A-A'). Upsizing of roof rafters an� first floor joists to <br />2"x10" with R-30 6ber};lass insulation placed as per code. <br />See page 5, Foundation Detail. #4 rebar/24" stubs placed 9" ac. vertically, adhered with <br />epoxy 4" �nto existing foundation. <br />3. See page 2, Lower Plan View, removed partition. <br />4. See pages 2,3, & 4, Ylan Views for all floors. liardwired detectors in bedrooms, (more <br />information on electrical plan.) Existing detectors monitored by ADT. <br />5. Sec page 2,8, 8r 9, Lower Plun View and South and West Sections. 4 vents cr, 8"x 16"= 3.5 <br />fi'` <br />6. See pagc 4, Upper Plan View. Fans placed in both bathroom portions vented to outdoors. <br />More detail included with electrical plans. <br />7. See pages 2-4 and 1 l, Plan Views und Window Schedule. Initial plans are to code. <br />8. See page 5, �uundation DetaiL Connection made Simpson LUS 210 Joist Hangers. <br />9. Sce page 6,7, & 8, Main and Upper I�loor Praming Plans and West View Section. Changed <br />bcam and post iimensions to 6x8" beam and 6x6" posts. <br />Sincercly, <br />�� 1i-�� <br />�� -- <br />Ryan Sandstrom <br />Owner/Builder <br />�CC��OMf� <br />JUL 1 1 1002 D <br />CITY OF �V$R�1"T <br />Permit ServfCes <br />
The URL can be used to link to this page
Your browser does not support the video tag.