Laserfiche WebLink
M. EDWARD HARKIN, P.E. <br />Consulting Engineers <br />2222 S.W. Barton St. <br />SEATTLE, WA. 98106 <br />(206) 935-1993 <br />Dr. s <br />Seattle, Wa. 98136 <br />AUG 71987 <br />EVERETT BUILDING DEPT. <br />DATE Aug..6th., 1987 <br />SUBJECT Henry Bacon Building_ <br />Smith Island, Everett.__ <br />Carl --- I visited the subject building today and observed the situation <br />of the 2 air conditioning units on the roof. I crawl-PB <br />into the space between the roof joists and the ceiling joists and <br />noted that the members supporting the air conditioning units are <br />prefabricated wood trusses. The load from each air conditioning unit <br />is spread over 3 trusses i.e. approximately 263# per truss and <br />should pose no problem providing the trusses were properly engineered <br />by St. Regis, the truss manufacturer. <br />❑ PLFASE REPLY ❑ NO REPLY NECESSARYSIGNED <br />I <br />