My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
701 35TH ST 2018-01-02 MF Import
>
Address Records
>
35TH ST
>
701
>
701 35TH ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2021 12:26:17 PM
Creation date
4/1/2017 4:14:28 PM
Metadata
Fields
Template:
Address Document
Street Name
35TH ST
Street Number
701
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order <br />Issued By SJT2 SPOONER, JAMES T. <br />Issued Department Pw PUBLIC WORKS <br />Date Issued 7/19/2011 <br />Fund 401 Accounts Program 710 Function 119 <br />Program <br />Title REPAIR .75 INCH 701 35TH ST 7101 I9675 <br />Page 2 <br />8/8/2011 10:21 <br />Activity 675 <br />Work Order No 20111052 Project Activity Type CORRECTIVE MAINTENANCE <br />Status 7/19/2011 Time 09:59 Original WO Billing __ <br />Probtem Details <br />CONTRACTOR HAS REMOVED ENTIRE STREET INCLUDING SIDEWALKS <br />FROM 34TH TO 35TH STREET. CITY WILL REPLACE CONTRACTOR <br />PACK -JOINTS AT MAIN, AND POLY JUMPERS I KITH COPPER. NEW <br />STREET WILL BE CONCRETE. <br />Structure ID affa Activi Comol Date <br />WS3095LO26 WASRVC YES 711812011 <br />Address 701 35TH ST <br />Cross Street <br />Area Designator Structure Location <br />Map Reference 701 351H ST <br />Location <br />Type Vehicle No Description <br />1nneo innn cnan 1 1/2 TON SERVICE TR <br />Type Maier No <br />M COUP36143547 <br />M COUP34141147 <br />M COUP34004547 <br />M PIPE34042847 <br />Vehicle Costs <br />Hours <br />2 <br />Total Vehicle Cost <br />Material Costs <br />Cost Billing Date <br />20.6 07119/2011 <br />$20.60 <br />Cost <br />Comments <br />Status cL <br />Code Warehouse <br />Code Warehouse <br />COUPLINGI—FLARE COPPER TUBE NU <br />1 <br />7.Ub7 <br />umaieu" <br />1�1. <br />COUPLING 314 CTS COMPRESSION X <br />1 <br />6.56 <br />07/19/2011 <br />PAN <br />COUPLING 3/4 FIP X 3/4 COPPER F <br />1 <br />2.92 <br />07/19/2011 <br />PAN <br />PIPE 314 COPPER TUBING TYPE K <br />4 <br />12.48 <br />07/19/2011 <br />PAN <br />Type ID Name <br />P RJP RAPELYEA, JASON P <br />P WDL WEAVER, DEAN L. <br />Total Material Cost ,-- <br />Personnel Costs <br />Hours Cost Billing Date Earning Code Class <br />2 36.37 07/19/2011 <br />2 59.936 07/19/2011 <br />Total Personnel Cost $96.31 <br />Total Cost $145.93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.