My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
730 35TH ST 2018-01-02 MF Import
>
Address Records
>
35TH ST
>
730
>
730 35TH ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2021 12:31:51 PM
Creation date
4/1/2017 4:15:58 PM
Metadata
Fields
Template:
Address Document
Street Name
35TH ST
Street Number
730
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br />t 0 <br />INFORMATION FOR DEVELOPER: <br />The following information is provided for the developer's benefit. These are not SEPA conditions but <br />associated with other laws or requirements. All requirements are preliminary in nature, and are based <br />upon the preliminary site plan and the ordinances in effect, at time of submittal for SEPA review. The <br />proposal must comply with all ordinances in effect at the time a complete building permit application <br />is filed, including those not specifically set forth herein. (Exception: For vesting under the Zoning <br />Code, please refer to Section 44 of the Zoning Code). Contact the Planning Department for information <br />regarding appeals processes for the requirements listed in this document. <br />1. The road should be realigned to allow better clearance from the roadway to the building. A <br />minimum clearance of 6 feet shall be maintained from the face of curb to the nearest obstruction (i.e. <br />the face of the new valve house). The city is typically trying to improve pedestrian access along our <br />roadways. If O&M would like to volunteer to install sidewalks at this location, it would be a <br />valuable improvement to the neighborhood. <br />2. Any grading/fill on this site shall be done so as to not impact the surrounding properties. <br />3. City streets and alleys are to be kept clear of dirt and debris at all times during construction. Dust <br />suppression and street cleaning must occur as directed by the Public Works Inspector. <br />4. All exposed ground must be reseeded within 30 days of the completion of construction. If reseeding <br />is not practical due to weather or seasonal problems, the ground must be covered with mulch as <br />directed by the City Engineer. <br />5. Temporary erosion control measures for construction activity must be operational prior to <br />cemmencement of any clearing or earthw^rk. <br />Q <br />
The URL can be used to link to this page
Your browser does not support the video tag.