Laserfiche WebLink
i <br /> . ; � . <br /> � <br /> C. Ful� standard half street improvemen�� are required in accordance I <br /> with City Ordinance to 100th Street SE and 99th Street SE. I <br /> I <br /> i <br /> � <br /> D. Accese to the site shall be fram 100th Street SE and 99[h Street <br /> i SE. A single access point, as appraved by the City Traffic <br /> i� <br /> � Engineer, will be allowed from 19th Avenue SE. <br /> � II <br /> jl <br /> I' E. i'arking muat be to city design and construction atandarda. <br /> il <br /> I Parking requirements for Phase A ehall be .75 per unit. I <br /> �II Subsequent phase requiremen[s will bia determined by the City i <br /> �i Traffic Engineer based on facility demand, available van service, I <br /> i� etc. 30X compact parking is allowed. � <br /> I I <br /> I <br /> �� F. In lieu of on-site detention, a drainage fee may be paid to the I <br /> � <br /> city by the applicant. All drainage .from this eite must be <br /> �i <br /> il tightlined to the existing drainage system at 19th Avenue SE and <br /> �� <br /> � <br /> jlOQth Street SE. The Silver Lake Water Dietrict will be <br /> I�I <br /> �, <br /> �� constructing a water line on LOOth Street SE this summer. The <br /> il� applicant ahould coordinate with the Dietrict to enaure that <br /> ii <br /> liwater service for this eite is properly located. <br /> I I <br /> i �,I G. A fire hydrant ie required within 200 driving feet but not cloeer I <br />� I than 50 feet of every structure. <br /> i <br /> I� <br /> I H. City etreets and alleya are to be kept clear of dirt ana debrie <br /> I <br /> � <br /> �i at all times during conetruction. Duat suppreaeion and etreet <br /> II cleaning muat occur as directed the the Public Worka Inepector. <br />� �i I� <br /> jII I• Performance guarantees are required for street and landscaping <br />� I <br /> � improvements. <br />} �I <br /> i � <br />; il <br />� j� J. A one year guarantee is required on the public street and <br />� <br /> ,i <br /> landscaping for an amount not leas than lOX of the coat of <br /> construction and ehall run for one year from the date of issuance <br /> of the first Occupancy Permit for the project. <br /> K. A two year guaran[ee is required for any drainage <br /> treatment/abatement facilities serving a'reas larger than one (1) <br /> acre. <br /> �' <br /> -3- <br />