My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10101 19TH AVE SE SILVER LAKE EYE CARE CENTER 2018-01-02 MF Import
>
Address Records
>
19TH AVE SE
>
10101
>
SILVER LAKE EYE CARE CENTER
>
10101 19TH AVE SE SILVER LAKE EYE CARE CENTER 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2020 11:10:14 AM
Creation date
4/2/2017 8:05:50 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10101
Tenant Name
SILVER LAKE EYE CARE CENTER
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C ( <br /> .� <br /> NOTICE OF DECISION <br /> AND <br /> FINAL MITIGATED <br /> DETERMINATION OF NON-SiGNIFI�ANCE <br /> Sundholm Eye Ciinic <br /> SEPA#02-06'l <br /> Description of Proposaf: The proposal is a two phased development. The first phase is for the <br /> construction of a 5,856 square foot eye clinic which will provide a total of 39 pa�k:ing stalls on site. The <br /> second phase will include the construction of another 4,000-5,000 square foot office building and associated <br /> parking. Approximately 9,000-3,000 cubic yards of dirt will be removed from the sitethrough both phases. <br /> Applicant: Lynette Sundholm <br /> 1710 100th PI. SE Ste 101 <br /> Everett, WA 98208 <br /> ; <br /> Representative: Gary Parkinson Architects—Gary Parlcinson ti`, <br /> 2812 Colby Avenue �i// ���" <br /> Everett, WA 98201 , �" �\' <br /> (� . ��� \,�. <br /> iocation: 10101 - 19TH AVE SE ,!�'; C " � ., . , <br /> � � / •�� <br /> � ", <br /> Zo�iing: B-26 Office \ \ //'\�\�� . <br /> \ \iy� 1�`,�� . <br /> General Plan: 4.2 Community Business �� � '-, ` �� <br /> L• ' <br /> Lead Agency: City of Everett Planning Department <br /> Contact Person: Becky Fauver Phone: (425) 257-7281 <br /> Miliqation Measures: <br /> The environmental impacts of this proposai ai� documented in the Environmental Checklist and other <br /> information on file with the City. The listed requiraments are placed in response to our review of this <br /> information: <br /> MITIGATION OF ADVERSE IMPACTS BY SEPA <br /> 1. Any grading/fill on this site shall be done so as to not impact the surrounding properties. (SEPA <br /> Earth, Land and Shoreline Use Policies.) <br /> 2, The traffic mitigation fee of$36,000.00 is required before any building permit can be issued <br /> ($18,000/bidg in 2 phases) (SEPA Transportation Policies) <br /> 3. 19'h Avenue SE is designated as a "Gateway" corridor in the City's General Plan. The General Plan <br /> states, "Because Everett wants to develop and promote an attractive image, all entry corridors into <br /> the City should be designated as "Gateways" and standards should be applied to developments <br /> � 2930 Wetmore, Suite 8-A,�verett, WA 9820,L;4Q44 'S (425)257-8731, Fax(425)257-8742 <br /> tU <br />
The URL can be used to link to this page
Your browser does not support the video tag.