Laserfiche WebLink
� <br /> r . � <br /> � Stwmwater Si�e Plan jor Norlhwut Anln�a!Care May 19,2001 <br /> � � <br /> � SECTION IV EROSION AND SEDIMENT CONTROL BMP'� <br /> 1 . The site area is less than an acre and is not subject to the Large Parcel requirements. An erosio,t <br /> control plan hes been developed however. 7'he plan includes conswction sequencing,clearing <br /> limits,silt fences,rocked constcuction entrance,catch besin inserts and cover practices. Seagonal <br /> I construction restrictions will apply. 7'he construction sequence is planned to be: <br /> [ L Conduct pre-construction meeting <br /> � 2. Flag or fence clearing limits. <br /> 3. Instell catch basin protection. <br /> I4. Instell construction enVance. <br /> 5. Install silt fence. <br /> b. Maintain and relocate erosion control measures as necessary during construction. <br /> (^ 7. Cover unworked arcas with mulch or hydro seeding. <br /> 8. Stabilize final-grade areas within seven dnys. <br /> L <br /> [ <br /> L <br /> L <br /> �_ <br /> I <br /> � <br /> � <br /> I <br /> I <br /> PqcB <br /> 14 <br /> �� _ _. _ _ <br /> ._ .. . _ _. .._ .. � . • . ._ 4:1 ( i . <br />