My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE COSTCO FUEL STATION 2016-01-01 MF Import
>
Address Records
>
19TH AVE SE
>
10200
>
COSTCO FUEL STATION
>
10200 19TH AVE SE COSTCO FUEL STATION 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2017 9:21:02 AM
Creation date
4/2/2017 9:18:16 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Tenant Name
COSTCO FUEL STATION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GHAV <br /> ��� �� GIVIL Et�GINEERIWG.IAND PLTN�lING SURVEYING.H:VIHOtlt1E�+��L 9Eti::':]S <br /> . � V <br /> n - u <br /> i Z April 2I, 200G <br /> s Py <br /> COURIER DELIVERY <br /> (T�NG ENG\Nf'6 <br /> c�cy or e����« <br /> Building Department �� <br /> Atm: Gordon Witcher �� <br /> 3200 Cedar Strect �p�i'z <br /> Everett, WA 98201 C',�� 1 Z0� O <br /> 6 <br /> RE: Rcsponscs to 13uilding Pcrmi[Application Plan Check Commcn h}SS�3�k)9�� <br /> Costco Wholesale Remil Fueling Faciliry �;��`)•�, <br /> 10200- 19th Avenue S.E.,Everett,Washington <br /> Costco Location No. 1 l4/Our 1ob No. 622G <br /> With this Ictter and the enclosed information, Barghausen Consulting Engincers, Inc., is responding to the <br /> plan check comments issued by lane Zimmennan for the project re(erenced above. Enclosed arc the <br /> following items for further review and approvaL• <br /> 1. One (I) set of redlined civil, landscape, and wedand mitigation plans provided by Jane <br /> Zimmerman <br /> 2. Two(2)sets of rcviscd plans datcd April 20, 2006 ' <br /> 3. Onc (I)rcdlincd Private Grindcr Pump Spccifications <br /> d. One(I) reviscd Private Grinder Pump Specifications and Details dated February 2,2006 <br /> The following outline references the sheet nwnbers containing ]ane Zimmerman's comments, along with <br /> a narrative response describing how each commcnt was addressed: <br /> Rer!lined Sheet C3.3 <br /> Response: Pump activation elevations are conec� and match infonn�tion in revised Grinder <br /> Pur�p Spccification as discusscd with our officc. <br /> Rerllrned Sl�ee� C3.-1 <br /> Response: (I) Ovcrllow spillw:iy details revised to eliminate die washed gravel below clevation <br /> SG0.5; (2) Additional Special Notes added to assure that adequate measures arc in place for water <br /> quality protection during construction; (3) Temporary discharge pipc pro��ided for keeping <br /> wetland ponding Ievcl below grading limits as discussed; (d) Revised cross-section and silt fence <br /> location to bcucr rcprescnt thc limits of gradin�. <br /> Herllined Sheer C3.5 <br /> Respo��se: Pump acti�-ation elevations are correct and match information in revised Grinder <br /> Pump Spccification as discusscd with our o(fice. <br /> � <br /> 18215 72ND AVENUE SOUTH KENT,1"JA 98032 (425)257-G222 (d25�251-8782 FA,( 'U <br /> BRANCH OFFICES ♦ OLVMPIA.WA ♦ TEMECULA,CA ♦ WAW�T CREEK.CA <br /> www.barghause�.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.