My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE COSTCO FUEL STATION 2016-01-01 MF Import
>
Address Records
>
19TH AVE SE
>
10200
>
COSTCO FUEL STATION
>
10200 19TH AVE SE COSTCO FUEL STATION 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2017 9:21:02 AM
Creation date
4/2/2017 9:18:16 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Tenant Name
COSTCO FUEL STATION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�= PLANNlNG aN0 P����� �o�e��s <br /> � CO/N�NUN/TY OE�/ELOPME/NT Director <br /> : x-�:_ <br /> E,"��: ii'.; : <br /> March 10, 2003 ii�I�����,� I I� � <br /> l� <br />' Shapiro and Associates �' Mq� �, 1 2003 <br /> Marc E. Boule', Sr. Vice President <br /> 101 Yesler Way, Suite 400 � � <br /> .. <br /> . EVERE7T <br /> Seattle, WA 9B1O�} C��uY:urOO P"b�'c sa����Us <br /> Costco Wholesale <br /> Kim Stever <br /> y99 La!<e Drive <br /> Issaquah, WA 98027 <br /> RE: Costco, Proposed Site Modifications <br /> Dear Mr. Boule' and Ms. Stever, <br /> In your November 18, 2002 letter, you have requested direction from the City regarding <br /> how to address surface water, water quality, and wetland concerns raised by the Ciry as <br /> they pertain to additional development of the existing Costco site with a service station. <br /> These issues are critical since the pr��posed conceptual site plan would result in direct <br /> impacts to the existing wetland mitig��tion area and water quality facilities on site. <br /> As you are awarE, wetland alteration w�is permitterJ for the initial Costco development <br /> on the basis of an anolysis in an EIS for the site that ir.dicated that water qualiry <br /> (leaving the site) could be improved through the proposed mitigation improvements. <br /> The Shapiro lelter does not fully address pre�.�iously iterated City concerns regar�ing the <br /> modifications to the site and stormwater facilities for a gas station. Water qualily <br /> monitoring by itself will not address additiona� modification to wetlands on tFie site and <br /> to the storm drainage system. <br /> There are hvo major issues that must still be addressed before modifications can be <br /> made to the Costco site that would be consistent v�ith the EIS. These issues rrgard <br /> wetlands and stormwater facilities on the site. eoth issues must be addressed in <br /> accordance with the analysis and approach of the EIS hefore there will be adequate <br /> basis for the City to approve any modifications to the site. <br /> CITY OF EVERETT <br /> 2930 Wetmore Avenue, Suite 8-A• Everell, WA 98201 •(425) 257-8731 • Fax (425) 257-8742 <br />
The URL can be used to link to this page
Your browser does not support the video tag.