My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE COSTCO FUEL STATION 2016-01-01 MF Import
>
Address Records
>
19TH AVE SE
>
10200
>
COSTCO FUEL STATION
>
10200 19TH AVE SE COSTCO FUEL STATION 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2017 9:21:02 AM
Creation date
4/2/2017 9:18:16 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Tenant Name
COSTCO FUEL STATION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOTECHN!CAL ENGINEERING STUDY <br /> Costco Wholesale <br /> c/o Barghausen Consulting Engineers E-8556 <br /> January 13, 1999 Page 11 <br /> Pavement Areas <br /> The adeq�acy of site pavemants is related in part to t�ie condition of the underlying subgrade. <br /> To provide a proper!y prepared subgrade for pavements, the subgrade should be treated and <br /> prepared as described in the "Site Preparation and General Earthwork" section of this report. <br /> Pavement subgrade should be in a firm and unyielding condition when proofrolled, and fill <br /> areas should meet the requirements of structural fill. In localized areas of soft, wet, or <br /> unstable subgrade, a greater thickness of structural fill or crushed rock may be needed to <br /> stabilizE ihese Iocaiized areas. Cement treatment and cement kiln dust treatment may also <br /> be considered for stabilizing wet areas of subgrade. <br /> The following flexible pavement section for lightly-loaded areas can be used: <br /> � Two inches of asphalt concrete (AC) over four inches of crushed rock base (CRB) <br /> material, or <br /> • T�vo inches of AC e�er three inches of asphalt treated base (ATB) material. <br /> Heavier truck-traffic areas wiil requir� thicker sections depending up�+n site usage, pavement <br /> life and site trafiic. As a general rule, the following flexible pavement sections can be <br /> r,onsidered for truck-trafficked areas: <br /> • Three inches of AC over six inches of CRB, or <br /> • Three inches of AC over fo�r and one half inches of ATB. <br /> These pavernent thicknesses may be modified based on anticipated traffic loads and <br /> frequency. <br /> In area: where rigid pavement is planned, the modulus of subgrade reaction of the subbase <br /> can be used iri the design. For rigid pavements supported on at least two feet of structural <br /> fill that is in a firm and unyieiding condition when proofrolled, a modulus of subgrade reaction <br /> of 250 pounds per cubic inch (pci) can be used for the subbase. If requested, ECI can provide <br /> subgrade reaction values for asphalt er cement treated subbase materials. <br /> [sih Consultan4, Inc. <br /> I� <br />
The URL can be used to link to this page
Your browser does not support the video tag.