Laserfiche WebLink
�i <br /> ' <br /> 5, STORM WATER DRAINAGE <br /> � <br /> A. Prior to grading the subject property, and prlor to ob[aining anyl <br /> � <br /> ' buildiag permita, the Owners shall eubmit a storm drainagei <br /> analysis for the property for vhich a building permit hsa been j <br /> i <br /> requeated, together crith a propoeal for mitigation and abatement � <br /> �� of storm drainage impacts resulting from cor.struction„ <br /> ' development and occupancy. A detailed etorm drainage plan for j <br /> I�' each phase of development ahall be submitted for approval to thel <br /> � City Public Worka Department as a part of each detailed eitel <br /> 'i <br /> � plan. The design, construction and maintenance of storm drainage <br /> �� <br /> ; facilities shall be in compliance vi[h all applicable or nances I <br /> ,' and the South Everett Drainnge Basins Plan, dated Fe'uruary, 1982, i <br /> � <br /> i�, and shall include the folloving, if applicable: � <br /> I <br /> � <br /> i. Shopping Center Creek shall be re-routed to the 19th Avenue <br /> , S.E. drainage ayatem. i � <br /> . � <br /> � I r <br /> i i tn <br /> �I � <br /> i: 11. Runoff from properties adjacent to 19th Avenue shall be <br /> �'i routed to the street drainage system. <br /> H � <br /> H '-� <br /> � H i- <br /> � � <br /> 6, pARk;S/OPEN SPACE � � <br /> � <br /> � F. <br /> p, Provl�tion of private open space and recrration facilities shall � F <br /> be estahlished for individual projects as they go through the � � <br /> � � <br /> ra <br /> si[e plan review process• � � <br /> o � <br /> r' <br /> � <br /> B. A greenbelt shall be preserved adjacent to l-5. Where vegetatlon � � <br /> in the greenbelt area is sparse, additional evergreen plantings F.;. <br /> �, <br /> shall be required to create a visual buffer between I-5 and the � � <br /> study area. It will not be the intent of this visual buffer to - <br /> [o[ally block the v1.ev of Chese properties from [he I-5 corridor. <br /> -7- <br />