Laserfiche WebLink
� <br /> xo. <br /> C [Iow many vchicular trips per day would bc gencrated by <br /> the campleted project? [f Imown, indicate when peak <br /> volumes wauld occur. <br /> Approximately 831 trips per day will be generated. <br /> Peak volmnes generaliy occur beriveen G and 6 p.m i <br /> �. Yroposed measures to reduce or control transportation � <br /> impacts, ifany: � <br /> Compliance with City of Everett standards for design , <br /> and development of roads. Paytnent of Traffic <br /> Mitigation fees to the City of Cverett in the amount of <br /> $1 I,700. <br /> t5. f'UBLIC SL•'IiVICGS <br /> a. Would the project rcsult in an incrcased need tor public <br /> services (for examplr. tire protection, police protection, <br /> hcalth care, schools, other)? If'so, generally describe. <br /> Yes. The proPosal will require an increased need of <br /> public services typical of �nultiple, two-story office <br /> buildings. <br /> 6. Proposed measures ta reduce or control direct impacts on <br /> public ser��ices, if'any: <br /> Pay�nent of required mitigation fees per City of <br /> Everett Traffic Mitigation Fees, as well as increasing <br /> the general tax base. <br /> tc;. UI'IL[1'IL'S <br /> a. Underline utilities currently available at the site: <br /> electricity; natural gas; water: ref'use service: telephone; <br /> sanitary sewer; septic system; other. <br /> Page 1� <br /> I� <br />