My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10315 19TH AVE SE SITE DEVELOPMENT 2016-01-01 MF Import
>
Address Records
>
19TH AVE SE
>
10315
>
SITE DEVELOPMENT
>
10315 19TH AVE SE SITE DEVELOPMENT 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2017 9:50:17 AM
Creation date
4/2/2017 9:49:57 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10315
Tenant Name
SITE DEVELOPMENT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. A fire �iydrant is required witfiin 200 driving feet but not closer than 5� feet of every <br /> structure. <br /> 8. City streets are to be clear of dirt and debris at all times during construction. Dust <br /> suppression and street cleaning must occur as directed by thc Public Works <br /> Inspector. <br /> 9. A one year warranty is required on the �ublic improvement for an amount nat less <br /> than 10% of the cost of construction and shall run for one year f�,�om the date of <br /> issuance of the first Occupancy Permit. <br /> 10. On-site watermain will be staked within an easement to the Gity. The easement will <br /> be submitted to the Ci±y prior to issuance of permits. <br /> 11. As-builts of storm sewer, sanitary sewer, and water systems will be required to be <br /> submitted per Ciry Design and Construction Standards and Specifications for <br /> Development. <br /> 12. Any broken or damaged sidewalk shall be repaired/replaced per the City Public Works <br /> Inspector. <br /> 13. Walkways must be provided from 19�h Avenue SE to each building. <br /> 14. A wetpond in series with a biofiltration swale is required for stormwater runoff <br /> treatment per city design and construction standards. <br /> 15. Easements for the publ;c sewer and water main must be granted prior to final <br /> approval of the Binding Site Plan or issuance of che first building permit. <br /> 16. A condition must be added to the final plat map that the vehicular left turns in and <br /> out of the site will be prohibited in the future. <br /> 17. Detention of storm �vater runoff is required in accordance with City standards. <br /> 18. Treatment of storm water runoff from paved areas must occur, per City standards, <br /> prior to discharge of the storm water from the site or to a stream or wetland. Storm <br /> water treatment is required when 5,000 square feet of pavement is created by a <br /> project. <br /> 19. Because this site is located within the Silver Lake drainage basin, the options for <br /> storm water treatment for this project are: <br /> a) wetpond or constructed wetland in series with a vegetated swale <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.