My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10315 19TH AVE SE SITE DEVELOPMENT 2016-01-01 MF Import
>
Address Records
>
19TH AVE SE
>
10315
>
SITE DEVELOPMENT
>
10315 19TH AVE SE SITE DEVELOPMENT 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2017 9:50:17 AM
Creation date
4/2/2017 9:49:57 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10315
Tenant Name
SITE DEVELOPMENT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> ' MJR Development <br /> c/o Northwest Developmeut Advisors LLC <br /> August 5, 2004 <br /> t Page 2 <br /> ' <br /> ' Access to thc underground vault will be via manholes located at the ends of the vault. A control <br /> structure will be located outside of the detention vault and will outlet to Catch Basins 7 and 8, <br /> then to the existing 24-inch storm drain located on 19`h Avenue Sout}:east. <br /> ' A pump will be installed in Catch Basin No. 7, immediately downstream from the restrictor <br /> manhole. This pump will convey stormwater from the 2-year storm to the water quality pond <br /> ' located on the east edge of the site 7'he maximum dischazge anticipated is one-half oi the pre- <br /> developed 2-year storm, or 0.03 cubic feet per second. Should the pump fail, the 2-y;ar storm <br /> � flow will overflow to Catch Basin No. 8 and th�m flow into the existing storm drair, system in <br /> 19'�' Avenue Southeast. <br /> I Plows in excess of the 2-year storm will out-fall directly to Catch Basin No. 8 and then to the <br /> existing drainage system in 19�' Avenue Southeast. <br /> I The pump will discharge into a 150-foot long vegetated treatment cell containing plantings at the <br /> bottom for nutrient control, which will be constructed at the east edge of the property. The <br /> volume of storage in this pond is 750 cubic feet, which is greater than 15 percent of the total <br /> Irequired dead storage (6-month developed storm) or 0.15 x 4,477=672 cubic feet. <br /> I Stormwater from thc water quality storm event will dischazge into a tworcartridge storm lilter <br /> manhole and finally discharge into the wetland. <br /> i <br /> I <br /> ( <br /> I <br /> I <br /> I U <br />
The URL can be used to link to this page
Your browser does not support the video tag.