Laserfiche WebLink
_ , <br /> xo. I <br /> c. llescribc thc purposc, typc. �nd apprasimatc quantities of <br /> any fillin�or grading nroposed. InJicate source of fill. I <br /> Approximately 2,80o cy. for site grading, utility and ! <br /> parking iet installation. No imported material wil[ be <br /> necessary. ' <br /> f: Could crosion occur as a result of cicaring, construction, ' <br /> or usel [f so, generally describe. <br /> Yes. The site will require IimiteJ grading. Erosion <br /> may occt�r dae to exposed soils. <br /> g. About what perccnt of thc sitc will be covcrcd �vith <br /> irnpervious surfaces atter project construction (for <br /> examplc, asphalt or buildings)? <br /> 73"0. <br /> h. I'roposcd tncasures to reducc or control crvsion or other <br /> impacts to Ihc carth, if any. <br /> Standard �nethods of T.E.,°,.C., as required by City of <br /> Everett and the D.O.E., will be utilized. <br /> 2 AIR <br /> a. What typcs of emissions to the air would result fi�om the <br /> proposal (i.e., dust, automobile, odors, and industrial wood <br /> smoke) during construction and when the project is <br /> completed? If any, generaliy describe and give <br /> approximate quantities, if known. <br /> Emissions from construction equiptnent. <br /> b. Arc thcrc any off-sitc sources of cmissions or o�lor that <br /> may aflect yow•proposal? [f so, generally describe. <br /> Off-site sources of emissions would be predominantly <br /> auto�nobiles. Impacts will be minimum. <br /> c. Yroposed measures to rcduce or control emission or othcr <br /> impacts to air, ifany: <br /> Spraying of water to combat dust during extended dry <br /> periods may be necessary, <br /> Page •1� <br /> �6 <br />