Laserfiche WebLink
INSPECTION REPORT � <br /> � <br /> Address /�3� /4 � �'7� <br /> Contractor � <br /> �� , Owner �F�b`�2a--�— <br /> Date -�—`�l�� <br /> � <br /> APPROVAL ❑ PARTIAL APPROVAL <br /> O VIOLATION 0 CORRECTION REQUESTED <br /> ❑Conections listed below MUST BE MADE before work can be approved. <br /> 7 Please contact inspector and arrange for appointment. <br /> 0 Was not able to peAorm inspection. <br /> O CALL 259-8810 FOR REINSPECTION-24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIQR TO OCCUPANCY. i <br /> Inspector D i <br /> E OF SPECTION REOUES <br /> ❑Temp. E .] raming U Gas Piping <br /> ❑ Footing �rywalf, Nailing 7 Consultat�on <br /> Q Foundatio .]Shear Nailing ❑Groundwork <br /> ❑ Ductwork �Grid ❑ Siruct.Slab <br /> ❑Wood Stove 0 Rough-in ❑ Final <br /> 0 Masonry ❑Service ❑ Insulation <br /> O Olher <br /> �BLDG: Pmt. No.�-��_0 MECH:Pmt No. <br /> ❑ELEC: Pmt. No. 0 PLBG:Pmt. No. <br /> i <br /> I <br />