Laserfiche WebLink
�} INSPECTION REPORT I <br /> /`� f <br /> Address /0�33 /����-.S� \ <br /> Contractor - <br /> � Owner ���� <br /> Date -����� I <br /> APPROVAL U PARTIAL APPROVAL <br /> ❑ VIULATION ❑ CORRECTION REQUESTED <br /> �Corrections listed below MUST BE MADE befo�e work can be approved. <br /> �Please contact inspector and arrange for appoiniment. <br /> �Was not able to pedorm inspection. <br /> J CAIL 259-8810 FOR REINSPECTION—24 haur no�ice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED P.ND POST"tD <br /> ON THE PREMISES PRIOR TO OCCUPANCY. � <br /> I <br /> �I <br /> — <br /> Inspector Da <br /> P F SPECTION RE(]UES <br /> J Temp. Elect J Framing ❑G s Pi ng <br /> J Footing U Drywall, Nailing J nsu tation <br /> U Foundation � Shear Nailing 0 roundwork <br /> U Ductwork U Grid ❑Struct. Slab <br /> ❑Wood Stova 0 Rough•in inal <br /> ]Masonry ❑Sernce �J Insulation <br /> ❑Other <br /> d BLDG: Pmt. No./�Y�'�1 MECH: Pmt.No. — <br /> / <br /> ❑ELEC: Pmt. No. ❑PLBG:Pmt.No. —.— � <br /> I <br />