Laserfiche WebLink
2001 Wz on Stete Nonresidential E Code Cort nce Form <br /> . • <br /> 2001 Wolvrpbn SUY NonraWenW ErwVY CaOs CmWir�Fam� Jurr 7Wt-KNA <br /> P'ojectAddrese ios3a iara avnme n Drte 7/10/2005 <br /> The tolbwing infortnatbn is necessary to eheck a mechaniwl permd application for complianee with Me mechanieal requiiamenta in the <br /> Washinqton Steta Nonresidential Energy Code. <br /> Applicability Code Location BuiWing Department <br /> (yea,no,n.a.) Ser.tion Component IMortnalion Raquired on Plans Notee <br /> HVAC REQUIREMENTS Secdons 7401•7424) <br /> 1417 Equipment performance <br /> •■• 1417.4 Pkg.elec.htg.d Gg. List heat pumps on sehedule <br /> Y•� 1411.1 Minimum efficiency Equipment schedule with type,capaciry,atficiency �f-1 <br /> 7472 HVAC controla <br /> Y•• 7412.1 Tempe2ture zones Indicate locations on plans et-1,2 <br /> Y�• 1472.2 Deadbend control Indicate 5 degree deadband minimum x-1 <br /> •+• 1412.3 Humidity control Indiwta humidistat <br /> Y•e 1472.4 Automatk setback InOicate thermostat wifh night setback anE 7 dM.day types t�-1 <br /> Y•s 1412.4.1 Dampers Indicate damper Iocation and automatic controls N-1 <br /> •+• 1412.4.2 Optimum Start Indicata optimum start controls <br /> •+• 1412.5 Heet pump conirol Indicate microprocesaor on thertnosUt schedule <br /> •a• 1•412.6 Combustior htg. Indicate moduleting or staged control <br /> Yoe 1412.7 Balancing IndMate balancing featurea on plans x-1 <br /> �n� 1a22 Thermoslat interlock Indicate thertnoatet interlak on plans <br /> �a� 1423 Ewnomizers Equipmant scheduie <br /> 1413 Air aconomizers <br /> Y•• 1413.1 Operation Indicate 100%capebilit, ..schedule d-1 <br /> •+� 14132 Control Indicate conVols abb to evaluete outside air <br /> •n• 1413.3 Inteprated oparation Indicate capnbiliry 1or partlal coolinp <br /> 1414 Ducting syatems <br /> Y•e 1414.1 Duct sealing Indicate sealing necessary M-1 <br /> Y�e 1414.2 Duct insuletion Indicata R-velue of Irreulation on dud M-1 <br /> •a• 1415.1 Piping inaulatbn Indiwte R-velue of insulation on piping <br /> 1418 Complalion Requiremente <br /> Yoe 1416.182 Drawings 8 Manuals Indicate raQuirement fa racord drawings and operetion dow. M-1 <br /> Y•• 7418.3.2 Air 8slancing Indicata air systam balance requirements N-1 <br /> •a• 1416.3.3 Hydronic Balancing Indicate hvdronic syetem balance requirements <br /> Y•s 1418.4 Commissioning Indicate raquirements 1or commisaioning end prelim.RepoA N-1 <br /> yae 1424 Separate air ays. Indiwte separate syatems on plans N-1 <br /> Y•e Mach. Sum.Fortn Completed and attaehad. Equipment schedule vnth rypes, M-i <br /> InpuUautput,efficiency,cfm.hp,economizar <br /> SERVICE WATER HEATING AND HEATED POOLS(Seetiona 1440•1454) <br /> 1440 Service water htg. <br /> •+• 1441 Elec.water heater Indicale R•10 insulation under tank <br /> •a• 1442 Shu1�oH controls Indicate automatic shut-oN <br /> 1443 Pipe Insuletion Indicate R-value of insulatinn on piping <br /> •a• 1453 Pool heater controls Indicate switch end 65 depree control <br /> •a� 1454 Pool covers Indicate vapor reta�dant cover <br />� •a. 1454 Pools 90+degrees Indicate R-12 pool cover <br /> no s c rc e or any ques on, provi e exp ana on: <br /> � <br /> � <br />