Laserfiche WebLink
. <br /> W. T. Duryea Company JN 87105 <br /> May 29, 1987 Page 6 <br /> The upper twelve (12) inches of pavement subgrade should be <br /> compacted to at least 95 pezcent of the maximum density. Below <br /> this level a compactive effort of 96 percent would be adequate. <br /> The pavement section for lightly loade:i traffic and parking <br /> areas should consist of two (2) inches �f asphalt concrete (AC) <br /> over four (4) inches of crushed reck base (C.RH) oz thzee (3) <br /> inches of asphalt treated base (ATB) . We zer_ommend if the <br /> driveway on the south side of the project is to serve as a city <br /> street accessing propezty to the west, that this dziveway be <br /> paved with three (•3) inches of AC over six (6) inches of CRB or <br /> four (4) inches of ATS. These guidelines are based on our <br /> �`'' experience in the atea and on what has been successful in <br /> similar situations. We can provide recommendations based on <br />�xir ' expected traffic loads and R value tests , if requested. Some <br /> maintenance and repair of limited areas can be expected. To <br />�:;; provide for a design without the need for any repaiz would be <br />�`` uneconomical. <br /> i <br /> 3': - <br />� SITE PREPARATION AND GENERAL EARTHWORK <br />,. <br />� Any structural fill under floor slabs oz foundations should <br /> F � <br />��. � � be placed in horizontal lifts and compacted to a density equal <br /> E • to or greater than 95 percent of thFe maximum dry density in <br /> E : accocdance with ASTM Test Designa`�ion D-1557-78 (Modified <br /> Proctor) . The fill materials should be placed at o; near the <br /> optimum moisture content. Fill under pavements and walks should <br /> also be placed in hotizontal lifts and compacted to 90 pezcent <br /> of the maximum density except for the top twelve (12) inches <br /> which should be compacted to 95 percent of maximum density. <br /> Ideally, structural fill which is to be placed in wet weather <br /> should consist of a granular material with a maximum particle <br /> size of three inches and no moze than 5 percent fines passing <br /> • the No . 206 sieve. <br /> LIMITATIONS <br /> Geological factors such as stratigraphic discontinuities <br /> that occur between test pits and soil exposures, or vaziations <br /> in groundwater co�ditions are not ptedictable with a limited <br />, exploration program or conventional engineering analysis . Such <br /> non-quantifiable risks must be borne by the owners . <br /> This report has been prepared for specific application to <br /> this project and for the exclusive use of W. T. Duzyea Company <br /> II <br /> I GEOTL'CH CO�SULTAhTS INC. <br />