Laserfiche WebLink
. i"°„i /i..', <br /> I <br /> i <br />� <br /> I ' <br />� I Responsible Official: Dennis Derickson <br /> Title: Planning Director <br /> Address: City Hall, 3002 Wetmore, Everett, WA 98201 <br /> Date: July 15, 1987 <br /> S�nature• ,Q�}t /a �,,..,, �.so`-�� <br /> You may appeal this determination to the City Clerk at City Hall, 3002 Wetmore <br /> Avznue no later th2n 10 days fYom the date the DNS becomes final by submitting <br /> I a uritten statement requesting an appeal which sets forth the name and address <br />� of the person aggrieved and =: clear and concise statement of the grounds for <br />� the appeal. You should be prepared to make specific factual objections. <br /> IContact Bob Landles to resd or ask about the procedures for SEPA appeals. <br /> i <br />� NOTE: This Final DNS may be withdraNn in the event of significant changes in <br /> . the proposal, disclosure of new significant information, <br /> I�I misrepresentatian by the applicant, or failure to comply with the <br /> conditions upon ahich this Determination of Non-Significance is <br /> predicated. <br /> INFORMATION FOR DEVELOPER: <br /> 1. Detailed drawings in accordance with City Design and Construction <br /> Standards shall be submitted to the Public Works Department showing <br /> site parking layout, landscaping, utilities, storm drainage, temporary <br /> construction erosion control, and all required improvements in the <br /> public right-of-way. Public Works Department approval of these <br /> drawings is required prior to any permits being issued. All <br /> improvements shall be completed, approved, and warranted before the <br /> Occupancy Permit is issued. <br /> 2, City streets and alleys are to be kept clear of dirt and debris at all <br /> times during construction. Dust suppression and street cleaning must <br /> occur as directed by the Public Works Inspector. <br /> 3, Performance guarantees are required for the public street improvements. <br /> 4. GTE Northwest has facilities at this location. However, any building <br /> entrances must be coordinated at least 60 days in advance. Your <br /> contact at GTE Northwest is John Moe, Project Engineer at 339-2�53• <br />