My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11419 19TH AVE SE 2018-01-02 MF Import
>
Address Records
>
19TH AVE SE
>
11419
>
11419 19TH AVE SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2020 9:10:51 AM
Creation date
4/2/2017 1:00:57 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11419
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� TRAPlSMITTAL <br /> �e����� �[�, i ��i�p���j �� Capital Architects <br /> �°•�°�•��• W ASHINGTON <br /> T0: Everett Public Warks Engineering/Public Service C o r Fr o r n t i o n <br /> 3200 Ced�r Street ���,� <br /> Everett,WA 98201 7812 Hewitt Ave Ste A <br /> ATTENTION: Tony R. I.ee. Plane Examiner Gverett,WA 98201 <br /> DATE: March 12,2003 Phone: 425.377.8017 <br /> PROJECT: Kaneris Retail/Office Complex 69711-023 F�a: dz5.37?.s469 <br /> I (� PER: Sandra Alder.AIA, IvIA16C,CP, NCAR6 <br /> TYPE: ❑ MEETING ❑ CONFERENCE ❑ MEMO ❑ TRANSMITTAL ❑ DIAP.Y <br /> VIA: ❑ MAIL ❑ COURIEP, ❑ FAX ❑ HAND <br /> item Ivumber TRANSMITTAL AND MESSAGE <br /> We are pleased to yummarize the following modificatione to the Kaneris ReCail/Office Complex. <br /> We now refer to Chis proJect a5"SILVER LAKE PLAZA". <br /> Please find attached two copies of the architectural. structural plany and calculations, for <br /> your review. <br /> 6UILDING We have not change the fuot�rint of any huildina,. However,we found calculation errors in the <br /> AREAS werall square footage propo5ed and find that the building area is reduced and subaea�uently. <br /> we can reduce the reo�uired �arkinn. We have maintained the 10�1 parking epacee reKuired from <br /> thz original ec�uare fcotage. <br /> 51TE PARKING We have inade minor changee to the parking 5tall arranyement:5 bae,ed upon the actual eite <br /> LAYOUT survey. VJe have reloc�ted the placement of the Van accessible �nd handicap etalls ta meet <br /> ramping requ!rement:,. <br /> 6UILDING The columny at ths out5ide edga oF the canopie5 hnve bean remwed.�nd the 12" CMU. <br /> ELEVATIONS juxt,aposing the ytor�front n�aintain the vieual relief and appearanca of columny. <br /> The EIFS has been repl„�cd by split face and smooth face CMU. The entire parapet ie now <br /> CMU. <br /> Ali ytorefront rnodulee and column dimen5ioning hae baen maintained. The towere remain, <br /> however the EIFS has been renlaced with Smooth faced CMU. <br /> We have reduced the number of 2 foot stepy in each huilding from two to onz. This allaws for <br /> direct reepanse to 5urvey gradee. <br /> 6UILDING ih�� con5tructien of the interior demising walls has changed from a CMU to waod etud <br /> PLGASG AUVISL IF 7'HIS COpIS1UNICATION UIITERS PRO\t YOUR UNDERSTANDING,UNLESS OTHERWISC•NOTIFIEU, <br /> Copilal Archilccu R'ashin�tun Corporatian N'ILL ASSUNE fi:S CORRECT. <br /> PAGE l or Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.