My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11419 19TH AVE SE LAND USE REVIEW 2016-01-01 MF Import
>
Address Records
>
19TH AVE SE
>
11419
>
LAND USE REVIEW
>
11419 19TH AVE SE LAND USE REVIEW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2017 1:13:02 PM
Creation date
4/2/2017 1:12:46 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11419
Tenant Name
LAND USE REVIEW
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 19, 1996 <br /> MITIGATED <br /> DETERMINATION OF NON-SIGNIFICANCE <br /> SEPA #39-96 <br /> Kaneris <br /> DESCRIPTION OF PROPOSAL: The proposed action is the issuance of a Shoreline Substantial <br /> Development Permit to allow the construction of four commercial buildings in two phases. Phase <br /> I consists of the construction of three buildings totaling 20,300 square feet in area and Phase II <br /> consisting of a 2,250 addition to Building A in Phase I and construction of an additional building <br /> 7,500 square feet in area. The total building area for both phases will be approximately 30,050 <br /> square feet. <br /> PROPONENT: George Kaneris <br /> 11419 19th Avenue S.E. <br /> Everett, Washington 98201 <br /> PROPONENT'S <br /> REPRESENTATIVE: Laura 13rent <br /> 2924 Colby Avenue <br /> Everett, Washington 98201 <br /> LOCATION: 11419 19th Avenue S.E. <br /> ZONING: B-1 <br /> GENERAL PLAN: Neighborhood Business <br /> Lead Agency: City of Everett Planning Department <br /> Contact Person: Gerry Ervine Phone: 259-8731 <br /> Mitigation Measures: <br /> The environmental impacts of this proposal are documented in the Environmental Checklist and <br /> other information on file with the City. The listed requirements are placed in response to our <br /> review of this information: <br /> AGENCIES W/TH JURISDICTION <br /> l. A Hydraulics Project Approval (I-�A) from the State Department of Fish and Wildlife may be <br /> required for this project due to discharge of stormwater to a wetland associated with Silver <br /> Lake. A copy of the HPA or a letter from the Department of Fisheries and Wildlife stating <br /> that an HPA is not needed should be included along with the plans for Public Works review. <br /> 3/L' <br />
The URL can be used to link to this page
Your browser does not support the video tag.