My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11830 19TH AVE SE 2016-01-01 MF Import
>
Address Records
>
19TH AVE SE
>
11830
>
11830 19TH AVE SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2017 1:41:42 PM
Creation date
4/2/2017 1:40:31 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11830
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n� <br /> . PUBLIC WORKS DEPARTMENT <br /> COST ESTIMATE SHEET UT=�+ITIES DIVISION <br /> 2300 CEDAR STREE;T <br /> EVERETT, WASHINGTON 98201 <br /> (.� /' (206) 259-8800 <br /> i Receipt # I��P Date Paid _ �j�n <br /> . ' <br /> X Cost of Work Order $9322 Work Grder # <br /> X Cost of Service Order $1200 Service Order # <br /> Requested By: Gord�n Witcher Date of Request 7-26-90 <br /> r.' <br /> Property owner (name) Emorv Cole <br /> Charge Cost to {name if different than owner) <br /> Address 1513 Mukilteo B]vd City Mukilteo 2i 98275 � <br /> P <br /> i <br /> Installation Location 19th Ave. SE (118301 <br /> Installation type/description/size/etc. Tao 12�� main on East side of <br /> 19th P_ve. .��7rn �mm. '� - � � <br /> �t,.. � <br /> �e5�t. <br /> [X] The following estimate is based upon the Utilities Divisior. <br /> providing all labor, equipment, materials, restoration, and <br /> final hook-up. <br /> . [ ] The following estimate is based upon the Street Division work <br /> group providing all labor, equipment, materials and restoration <br /> to property. <br /> Whenevez the estimated coet ie not eufficient to cover the total expense for labor, <br /> material, equipment rental and administrative costs, the deficit shall be charged to <br /> the property for which such inetallation wae made and the owner thereof, and provided <br /> further, that any exceas payment aha11 be returned to the person applying for the <br /> installation. <br /> Itemized Cost Estimate: <br /> Labor & Overhead / 52 cc: susy Haugen <br /> MateTial clair olivere <br /> 3 3 Tom Thetford <br /> Equipment Rental g �on weitkamp <br /> xirk arooxe <br /> Sllrfdce RestoYdtloIl . 5 0 Gordon Witcher <br />' O. Don Wahl <br /> Service Order Cost <br /> Total �� /�� ��� <br /> s��- ZDDO - ..2�fj� ' <br /> Prepared by ('o�x.�s�.�''�-���� <br /> S',�;�^c.a cy,;c�� <br />� .Estimate does not includePcost of 2" water service - S12 0 fi d�fee � �,��L�p��%�p <br /> .,.. <br /> . -- -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.