My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12115 19TH AVE SE 2016-01-01 MF Import
>
Address Records
>
19TH AVE SE
>
12115
>
12115 19TH AVE SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2017 3:24:30 PM
Creation date
4/2/2017 1:57:33 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12115
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1038
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name of Project: <br />Lakeside Village Apartments <br />CongLruction Site Address: <br />121ML 19th Ave. S.E. <br />Permit Reference: <br />SEPA it 74-87 <br />ASSIGNMENT OP FUNDS TO THE CITY OF EVEEUIF <br />For: (describe improvements) <br />. Traffic signal at the intersection of 19th Ave. S.E. and Silver <br />Lake Road. <br />r rCNoc,> -T 2._-3 4 5 <br />Improvements to be installed per City standards by December 31 19 89 • <br />We hereby agree that the sum of $ 23, 730.00 will be held in Wtb <br />Account No. 601764 in SEATTLE -FIRST NATIONAL BANK (hereinafter <br />referred to as "Bank") in the naive of SILVER LAKE ASSOCIATES L.R(hereinafter <br />referred to as "Applicant") to assure performance of the above-described <br />improvements and guarantee that these funds will not be released without <br />prior written approval from the City of Everett Public Works Department <br />(hereinafter referred to as "City"). We agree that upon completion of the <br />installation of the improvements per City standards and approval by the <br />City, the City will provide written notice to the Bank authorizing the <br />release of these funds. We further agree that these funds will be released <br />to the City upon notice by the City that the improvements have not been <br />installed per City standards. <br />Provided further, however, that in the event the above-described <br />improvements are installed per City standards and a certificate of partial <br />compliance is signed by the City, then in that event, we are further <br />instructed to release progress payments for that amount of improvements <br />installed per City standards and approved by the City. The City shall have <br />first claim .and priority to the remaining balance of said sun of <br />23,730.00 <br />By: <br />SEA'i.'TLE-FIRST NATIONAL BANK <br />(Name of Bank) <br />Address: i01 Fifth Avenue, Floor 14, Seattle, WA 98104 <br />Title: Authorized Signatory <br />Telephone no.: <br />Contact Person: <br />358-7680 <br />Kimberly Mace, Loan Administration Officer <br />00(62(14/1-(-- I rc) Sic 3,/`,'/9c) <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.