Laserfiche WebLink
PUBLIC WORK <br />item Unit <br />STORM SEWERS <br />Quantity Unit Price Amoun• <br />8 inch pipe L.F. <br />27 16.00 432 <br />12 inch pipe L.F. <br />483 2::.00 <br />18 inch pipe L.F. <br />10,62.6 <br />-0- 25.00 <br />24 inch pipe L.F. <br />-0- 30.00 <br />Unsuitable Excavation, <br />(2' over depth <br />and ballast) <br />L.F. <br />25' 2.50 63 <br />Standard Catch Basin Ea. <br />Extra Depth Excavation, <br />(over 12' deep) Ft/L.F. <br />5 <br />700.00 <br />3,500 <br />-0- 2.00 <br />48 inch MH/CB Type II Ea. -0- 1300.00 <br />54 inch MH/CB Type II Ea. -0- 1800.00 <br />Extra Depth MH/CB <br />48 inch <br />Per ft. over 12' <br />Extra Depth MH/CB <br />54 inch <br />Per foot over 12' . <br />Ft. <br />-0- 110.00 <br />Ft. <br />-0- 140.00 <br />Restrictor/Pollution Ctrl. Ea. -0- 350.00 <br />12 inch and large <br />Other <br />STORM SEWERS TOTAL <br />-4- <br />$ 14,621 <br />