Laserfiche WebLink
• <br />Item <br />PRIVATE WORK <br />Unit Quantity <br />STORM SEWERS <br />Unit Price Amount <br />4-6 inch pipe L.F. <br />2,375 6.00 <br />14,250 <br />8 inch pipe <br />L.F. 33 16.00 <br />528 <br />12 inch pipe L.F. <br />1,412 22.00 <br />31,064 <br />18 inch pipe <br />L.F. 505 <br />25.00 12,625 <br />36 inch pipe <br />L.F. 45 <br />Yard Basin Ea. <br />-0- <br />40.00 1,800 <br />100.00 <br />Standard Catch Basin Ea. 17 700.00 <br />11,900 <br />Extra Depth Excavation, <br />(over 12' deep) Ft/L.F. -0- 2.00 <br />48 inch MH/CB Type II Ea. 1 1300.00 <br />1)300 <br />54 inch MH/CB Type II Ea. 1 1800.00 <br />1,800 <br />Extra Depth MH/CB <br />48 inch <br />Per ft. over 12' <br />Extra Depth MH/CB <br />54 inch <br />Per ft. over 12' <br />Ft. <br />-0- <br />110.00 <br />Ft. -0- 140.00 <br />Restrictor Ea. <br />1 <br />350.00 350 <br />Other Intake #4 <br />Ea. 1 <br />1,500.00 1,500 <br />STORM SEWERS TOTAL $ 77,117 <br />-9- <br />4, <br />