Laserfiche WebLink
July 7, 198E <br />r.r. Mika Brown <br />t etco ['r•nntructinn <br />17018 I5th Avenue NE <br />Seattle, 26155 <br />Re: Performance Cuarantee <br />Gear tor. Drown: <br />The water rein construction is complete and accepted by tto City of Everett. <br />The assignment of funds to the City of Everett for $106,110.40 can Le released <br />upon receipt of a guarantee of $52,021.25 (which is the balrnrr of the <br />guarantee after: removing the water rain portion of $56,069.15) and a warranty <br />of $4,674.00 for the water main. <br />Sincerely, <br />ALFRED R. THEAL, F.C. <br />Public Works Director/City Engineer <br />By: Larry Crawforn <br />Assistant Putlic corks Director <br />LC/df,` <br />375>* <br />i <br />