Laserfiche WebLink
0 CONSTRUCTION, INC. <br />223 -01 -!NE -TC -OC #243K7 <br />17018 15th AVENUE N.E. <br />SEATTLE, WA 98155 <br />(206) 363-0316 <br />July 14, 1988 <br />Gordon Witcher <br />Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />RE: Adjustment to Lakeside Village Assignment of Funds <br />Dear Gordon: <br />The attached assignment rcrresents the improvements for storm, wgter, <br />sewer, clear and grade are complete. <br />Please note that the original assignment ($108,110.40) was reduced to <br />$61,369.44, reflecting the completion of the Public Water System. <br />This reduction did include an additional 20 per cent. The current <br />assignment presented for your approval is derived as follows: <br />Clear and Grade $ 4,200.00 <br />Sanitary Sewer 4,083.00 <br />Storm Conveyance 14,621.00 <br />Public Water 32,459.00 <br />Sub -total complete $ 55,363.00 x 1.2=$66,435.60 <br />Private Work Complete 15,000.00 <br />NEW TOTAL OF COMPLETED WORK $81,435.60 <br />Paving $ 17,343.00 <br />Curb and Gutter 2,178.00 <br />Sidewalk 2,345.00 <br />Signs and Striping 363.00 <br />Total $ 22,229.00 x 1.2=$26,674.80 <br />TOTAL ASSIGNMENT REMAINING: <br />$26,674.80 <br />If you have any questions or should you desire additional information, <br />please contact me. <br />Sincerely, <br />METCO CONSTRUCT I N, INC. <br />Michael Brown <br />