My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12326 19TH AVE SE 2016-01-01 MF Import
>
Address Records
>
19TH AVE SE
>
12326
>
12326 19TH AVE SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2017 2:04:43 PM
Creation date
4/2/2017 2:04:39 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12326
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Vllork Order Page � <br /> 6/14/2011 10:33 <br /> ISSUBd By CSG� CAVANAH,SHANE G. <br /> Issued ',-:Hartment aw PUBLIC WORKS <br /> Date Issua d 517BI2011 <br /> Fund ao� Account s Program �to Function �ty Activity 6�5 <br /> Program <br /> TIfIB REPAIR 7 INCH 12326 19TH AVE SE 710179675 <br /> Work Order No 20110797 Project Activity Type SF.RVICE REQUEST Status c� <br /> Status 5/18I2017 Time zz:3o Original WU _ __ Billing _ __ <br /> Customer Information <br /> Customer Name Customer ld <br /> Address Street <br /> Apartment No City <br /> State Z�P <br /> Subdivision Change Map Y/N <br /> Phone No ( ) - Ext <br /> Second Phone ( 1 - Ext ------- <br /> E-Mail Address <br /> Problem Information <br /> Address 1Y3Y6 Street �9TH AVE SE <br /> From Cross Street <br /> To Cross Street <br /> City ZiP <br /> Subdivision Map Book Map Reference <br /> Problem WATER WATER <br /> Sub Problem LEAK LEAK <br /> Requested By SKL2 SMITH,KEVIN L. DBtO R8q110510d 5�tanoil <br /> Agency Related Request 000sesas <br /> Initiated From OCD OTIIER CITY DEPARTMENTS <br /> Utility Locate(USA) No Called Date Expiration Date <br /> Assignment Information <br /> Dept Pw PU�LIC WORKS Priority Estimated Hours <br /> Crew <br /> Contractor <br /> Assigr.ed To CSG CAVANAH,SHANE G. <br /> Assigned By <br /> Assigned Date To Be Comp Date <br /> Scheduled Date Scheduled Time <br /> Route Route Sequence <br /> Comments <br /> Action Taken REPLACED COMPRESSION FITTING WITH 1"COPPER TUBE NUT WITH t"FIP INSTA,3' <br /> POLY,THEN INSTA W/COMP TO THE COPPER,PUT TRACING WIRE FROM COPPER TO CORP. <br /> Recommended Action <br /> Approved By HLd Husav, �nNCE�. Job Cost Information(YIN) <br /> Start Date I i Time Date Compieted 5Nei2o�� Permit No ___ <br /> Completed By Time Follow Up? <br /> \i� <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.