My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12815 19TH AVE SE 2018-01-02 MF Import
>
Address Records
>
19TH AVE SE
>
12815
>
12815 19TH AVE SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 2:11:01 PM
Creation date
4/2/2017 2:24:33 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12815
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />! Northwest Discharge Point <br />(Downstream Map 2) <br />•"1 <br />The Proposed detention system will drain to a catchbasin near the northwest corner of the <br />property in the Bothell Everett Highway. From this point the roadway drainage flows <br />north, along the cast side of the highway (Photo 1), in a 12" to a second catchbasin <br />approximately 210 feet north. A 30" CNIP culvert also connects to this catchbasin from <br />the west, and flows from the west and south drain east through a 24 inch CMP pipe <br />(Photo 3) to the approximately I acre Herschlip Pond (Photo 2.) Approximately 250 feet <br />east of the pond inlet, a 47"x71" CIMP arch culvert (Photos 4 and 5) drains the pond, <br />discharging to a protected outlet (Photo 10) approximately 350 feet further east. This <br />i culvert was installed to provide fish passage to the pond and was designed per State of <br />Washington Department of Fisheries standards as part of the Herschlip residential <br />development. At this point drainage from the Northeast discharge point, as well as most <br />of the surrounding residential development, join the flowpath as they all enter a stream. <br />The total distance from the detention system outlet to this point is approximately 800 <br />feet. <br />c, <br />r�� <br />rl; <br />A L a i 1 <br />I" - _' �_9 _ �� �i�',�. �n',y •. �• '. �I �yV: Jy,��'.�•h. ` t rr loll <br />�"_ `V c, .✓vV'� .: *.1,,�- 9,Lf '��G %t o J'�.+;. 'p ' ` �J�'?fl tl <br />Photo 1. Facing North from existing Northwest Entrance. Approximate <br />route of underground storm drainage conveyance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.