Laserfiche WebLink
Project Info <br />Project Address Bill Creak Store Remodel, f458 <br />Date 1/16/2008 <br />12906 Bothell -Everett Hey. <br />For Building Dept. Use <br />B111 Creak, WA 98206 <br />Applicant Name: Bolvannyc2 A -hitecture <br />Applicant Address. 6Cl SW end Avenure, Fuite 1200 - ?ortland, OR 97 <br />Applicant Phone. 1.503.223.8VO <br />Project Description <br />Briefly describe mechanical no <br />system type and features. <br />® Includes Plans I Drawings must contain notes requireing compliance with commissioning requirements - Section 1416 <br />fa Simple System Q Complex System O Systems Analysis <br />Compliance Option (See Decision Flowchart (over) for qualifications. Use separate MFCH-SUM for simple 8 complex systems.) <br />Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the <br />plans. For projects without plans, fill in the required information below. <br />Cooling Equipment Schedule <br />Equip. <br />ID <br />Brand Name' <br />Model No.' <br />Capaclly2 <br />Blulh <br />Tmal CFM <br />OSA CFM <br />or Econo? <br />SEER <br />or EER <br />IPLV <br />Location <br />FC-2 <br />Bryant (split Indoor) <br />619FNF 024000 <br />18600 <br />390 <br />N/A <br />13.00 <br />N/A <br />ccT Room <br />cu-2 <br />Bryant (split <br />Outdoor) <br />538EN7 024000 <br />18600 <br />390 <br />N/A <br />13.00 <br />N/A <br />CCxv Room <br />Heatin Et to nlent Schedule <br />Equip. <br />ID <br />Brand Name' <br />Model No <br />CapacJW <br />Blufh <br />Total CFM <br />OSA cirri <br />or Eeono? <br />Input Blurt <br />Output Btuh <br />Efficient ' <br />N/A <br />Fan Equipment Schedule <br />Equip. <br />ID <br />Brand Name' <br />Model No.' <br />CFM <br />gF' <br />HPIBHP <br />Flow Comm(' <br />Location of Service <br />EF-9 <br />CaptivoAir <br />DU25HFA <br />600 <br />0.45" <br />0.25 <br />CV <br />OoldamtCh Room <br />EF-22 <br />CaptiveAir <br />DU33HFA <br />700 <br />0.55" <br />0.33 <br />CV <br />Beat Prep service <br />EF-23 <br />CaptiveAir <br />DU25HFA <br />400 <br />0.45" <br />0.25 <br />CV <br />Bali Prep Service <br />EF-24 <br />Captive r <br />NCAI6FA <br />3150 <br />0.75" <br />1.50 <br />cv <br />Deli Prop Service <br />'If available. 2 As tested according to Table 14-1A through 14 1G. 3 If required 4 COP, HSPF, Combustion Efficiency, or AFUE, as <br />applicable. 5 Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). <br />