Laserfiche WebLink
I"tCHURCHoi <br />JESUS CHRIST <br />01 LATTER-DAY <br />SAINTS <br />Dykeman, Oadet:..-_A <br />eaC10, <br />0"wers Building $ <br />Watt In ►ropreee <br />---------- <br />e Tempegluu Wolner � �� � �� <br />❑ Yes 0 0 <br />Const t� Pt pled Progress Report <br />Chutch Building Division <br />50 East North Temple Street <br />Sall Lak^ City. Ulah 84150 <br />""heft"�rd Ward <br />`}i fM-ett Stake Center <br />to-- —------------ <br />Iverett, <br />July 14, 1980 <br />t �-`verett, Wa. <br />,.t.:W <br />Washington <br />Construction Co. <br />MASONRY - Pointing interior C.M.U. <br />CARPENTRY - Framing interior of Chapel. <br />ROOFER - Not on job. <br />ROOFING SHEET METAL - Not on job. <br />MECHANICAL - Roughing - in. <br />DRYWALL - Crew working i.. southwest wing. <br />PLASTERERS - Crow started in southeast wing. <br />od 77 <br />Denton <br />Problem Areas: <br />1. Interior C.M.U. of tower broken down part way. Contractor still working <br />inside will notify when detailed construction has been reached. <br />2. Electric meter base located on north face of Multipurpose Room in conflict <br />with location shown on electrical plans. <br />3. Reglet not yet installed. Reglet installed up sloped areas of brick <br />walls is unacceptable in some areas due to lack of over lap. Some <br />reglet does not follow same slope as roof. <br />4. Ladder being installed up to Mechanical Room #203. <br />Instructions to Jerry Denton: <br />1. Check location of meter base for proper location. <br />A. Gary O'Leary <br />Contract Administrator <br />cc: Church Building Division <br />Gene Berger <br />President Fowler <br />Bishop Todd <br />Bowers Building $ Const. Co. - SLC <br />Bowers Building $ Const. Co. - Site <br />The lace nlculat wrn,4 e n ,pecle0 shell not be cons.oere0 a worn at the repueement of strict compilance with the Conhacl nor uro.-nu <br />Sp ore <br />Contract administrator. _ <br />w. (:.HM1. -IN . P -[yC --` 1.0.1e wrle W ell Now..um <br />