Laserfiche WebLink
T"FCHURCHoi <br />JESUS CHRIST <br />°FLATTER nAY <br />SAINTS <br />All: nl Oct <br />D keman, Ogden, <br />onlrKlot <br />owers Buildinty_ <br />Oyes 0No <br />Cons. ..:Non Protect Progress Report <br />Church Building Division <br />50 East North Temple Street <br />Sall Lake City, Utah 84150 <br />verett Stake -Center <br />Everett. <br />f>e Dl plotect <br />dridge F�Quinton �airw_o_od 7_7 <br />wlln <br />Construction Co, ferry Denton <br />September 3s _1 00 <br />- ANorthwe_st_(2)� <br />Washsngton <br />CARPENTRY - Building rostrum in Chapel. <br />MASONRY - Finishing tower. Grouting brick veneer below mid -level. <br />PAINTING North corridor and northwest wing. Staining cabinets and <br />millwork. <br />ACOUSTICAL TILE - Northeast wing. <br />CERAMIC TILE - Floor in font. <br />PLUMBER - Completing inside gas 'look -ups. <br />OBSERVATIO14S $ DISCUSSIONS: <br />1. Some touch-up work remains to be done on concrete beams. <br />2. Landscape work has not started primarily due to the fact that brick masons <br />debris is still scattered about the jobsite. <br />3. Observed areas around window jambs in Chapel where paint coat is light. <br />Windows were not masked prior to painting. <br />4. Contractor has installed chalkboards and tackboards throughout project. <br />S. Gas Company meter not yet installed. <br />A. Gary O'Leary <br />Contract Administrator <br />AGO/lv <br />Original: File <br />cc: Bowers Building $ Construction Co. - SLC $ Site <br />Church Building Division <br />Gene Berger <br />Bishop Todd <br />President Fowler <br />The fact that any parhculat work haS been inspected shall ,Of Ire cor400led a waiver of file isqunement of SIMI compliance wily Ilse Ounttucl oac,ileols <br />A Contract Administrator _ <br />V iN tE - aud.[I. G.N.N. - ANY alc. PINK - t «C F.M«IMMw. F—wra lose W all <br />Pre W <br />