My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9509 19TH AVE SE 2018-01-02 MF Import
>
Address Records
>
19TH AVE SE
>
9509
>
9509 19TH AVE SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2021 10:00:49 AM
Creation date
4/2/2017 2:51:22 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9509
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UPDATED PROPOSAL <br />Proposal submitted to: Loration of job site: <br />Richard K.Hymas — Facilities Manager Everett Stake Center #2 <br />Seattle WA PM Group 9509 191h Ave. SE <br />Phone: 425.771.4207 Everett, WA 98208 <br />Fax: 425.771.4761 <br />Description of work to be performed: <br />1. Obtain permit to widen entryways. <br />2. Remove existing red curb, sidewalk, curb and gutter and concrete entries. <br />3. Prep and plain two new entries in concrete to meet city specs, and to allow for a more gradual <br />approach to entryways so cars don't `bottom out'. New entryways will be 35 feet long by 11 <br />feet wide. <br />4. Excavate grass, sod and dirt to approx. 10 inches in depth for asphalt extensions. <br />5. Place and compact 6 inches of 5/8 minus crushed rock sub base in two lifts of 3 inches. <br />6. Apply weed killer per specs. <br />7. Place and compact 3 inches of Class B asphalt. <br />8. Seal joints with AR-4000 tar sealant. <br />9. All cuts required will be sawcut. <br />10. Work to be completed in two phases. <br />We hereby propose to furnish labor and materials <br />complete in accordance with the above <br />specifications for the sum of $as shown above <br />with payment to be made in full upon completion <br />of the work unless other terns are arranged prior to <br />the beginning of work. NOTE: Ifthe above <br />proposal includes asphalt repair, that price includes <br />removal of asphalt up to 2 inches in depth. Should <br />additional asphalt or sub base have to be removed <br />and replaced, an additional cost will be incurred. <br />This proposal may be withdrawn if not accepted <br />within 20 days. <br />All material is guaranteed to be as specified. All work is <br />to be completed in a workmanlike manner according to <br />standard practices. Any alteration or deviation from the <br />above specifications involving extra costs will be <br />executed only upon written orders and will become an <br />extra charge over and above the estimate. All <br />agreements contingent upon strikes, accidents or delays <br />beyond our control. <br />Seal Pro authorized signature Date <br />ACCEPTANCE OF PROPOSAL <br />The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do <br />the work as specified. Payment will be made as outlined above. <br />Authorized signature <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.