My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9509 19TH AVE SE 2018-01-02 MF Import
>
Address Records
>
19TH AVE SE
>
9509
>
9509 19TH AVE SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2021 10:00:49 AM
Creation date
4/2/2017 2:51:22 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9509
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
You may appeal this determination by filing an appeal on forms provided by the Planning <br />Department and a fee to the Planning/Community Development Permit Services Counter at <br />3200 Cedar Street, 2nd Floor, no later than 14 days from the date the MDNS becomes final <br />(which is after the 14-day comment period). <br />Responsible <br />Official: Allan Giffen, Director <br />Title: Planning and Community Development Responsible Official <br />Address: 2930 Wetmore Avenue, Suite 8-A, Everett, WA 98201 <br />Date. December 14, 200' <br />Signature: l ( q / LI �- <br />Contact Faheem Siddiq to read or ask about the procedures for SEPA appeals. <br />NOTE: A DNS may be withdrawn in the event of significant changes in the proposal, <br />disclosure of new significant information, misrepresentation by the applicant, or <br />failure to comply with the conditions upon which this Determination of Non - <br />Significance is predicated. <br />INFORMATION FOR DEVELOPER: <br />The following information is provided for the developer's benefit. These are not SEPA <br />conditions but are associated with other laws or requirements. All requirements are preliminary <br />in nature, and are based upon the preliminary site plan and the crdirances in effect at the time <br />of submittal for SEPA review. The proposal must comply with all ordinances in effect at the <br />time a complete building permit application is filed, including those not specifically set <br />for herein. (Exception: For vesting under the Zoning Code, please refer to Section 44 of the <br />Zoning Code). Contact the Planning Department for information regarding appeals processed <br />for the requirements listed in this document. <br />A Public Works Permit is required for this project. Detailed drawings in accordance with <br />City Design and Ccnstruction Standards shall be submitted to the Public Works <br />Dep.^,rtment. showing site parking layout, landscaping, utilities, storm drainage, temporary <br />construction erosion control, and all required improvements in the public right-of-way. <br />Public Works Department approval of these drawings is required prior to any permits being <br />issued. All improvements shall be completed, before the final approva: is granted. <br />2. Parking must be per City Zoning Code and City Design and Construction Standards for <br />Development. <br />(2/ <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.