My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9509 19TH AVE SE 2018-01-02 MF Import
>
Address Records
>
19TH AVE SE
>
9509
>
9509 19TH AVE SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2021 10:00:49 AM
Creation date
4/2/2017 2:51:22 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9509
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />Everett LDS Parking Lot Expansion <br />Storm Drainage Report <br />4. Analysis and Design of Required Erosion and Sediment Control BMPs <br />Silt fencing is proposed along the downstream perimeter of the disturbed area (northeast comer of the <br />property). Inlet protection will be installed in the existing catch basins near disturbed portions of the site. <br />Site management for ESC measures are not limited tc the above listed best management practices (BMPs). <br />The contractor shall provide additional BMPs as appropriate for changing site conditions. <br />It is anticipated that there is little potential for erosion and sedimentation ofonsite earthwork to adversely u <br />impact downstream properties. <br />5. Analysis and Design of Required Runoff Control (Treatment and <br />Stream Bank Erosion Control) BMPs <br />Refer to Figure 5 — <br />page to aid in t re eiwi tWdiscussion. <br />e Upstream Basin was not included in the detention and water quality calculat <br />Basin was considered in the conveyance capacity analysis as shown in Section 3. <br />Upstream (Z J <br />S <br />o that a ridgeline is created between the existing parking lot;iudJhe-prepose�arking lot D M C <br />I expansion area thus separating drainage from the proposed expansion to its own system. Therefore, <br />only the onsite areas for the new development basin will be considered in the detention and water N N <br />quality analysis. I� <br />a <br />A <br />J �f(cur rJ,9 i00�( �d ��,,� -( <br />� to .5 <br />y5� � 7 i <br />m <br />C Wrgws 6 Project Data120 6113 Eaten LDS PaMw; LOO,,A%Sfa RePM506113 City of Eerelt -LDS Dreirepe Raport.Ene Ce 5 P of 36 f/1 <br />G <br />�� 1r� �����(�W` <br />
The URL can be used to link to this page
Your browser does not support the video tag.