Laserfiche WebLink
Everett LDS Parking Lot Expansion <br />Storm Drainage Report <br />4. Analysis and Design of Required Erosion and Sediment Control BMPs <br />Silt Icncing is proposed along the downstream perimeter of the disturbed area (northeast corner of the <br />property). Inlet protection will be installed in the existing catch basins near disturbed portions oflhe site. <br />Site management for ESC measures are not limited to the above listed best management practices <br />(BMPs). The contractor shall provide additional BMPs as appropriate for changing site conditions. <br />It is anticipated that there is little potential for erosion and sedimentation of onsite earthwork to adversely <br />impact downstream properties. <br />5. Analysis and Design of Required Runoff Control (Treatment and <br />Stream Bank Erosion Control) BMPs <br />Refer to Figure 5 — basins Exhibit on the following page to aid in the following discussion. <br />The Upstream Basin was considered in the conveyance capacity analysis as shown in Section 3. <br />Since Upstream Basin B is tributary to the new development area, the basin was included with the <br />onsite development area in both the detention and water quality sizing. <br />Note that a ridgeline is created between the existing parking lot and the proposed parking lot <br />expansion area thus separating drainage from the proposed expansion to its own system. Therefore, <br />only the onsite areas for the new development basin will be considered in the detention and water <br />quality analysis. <br />P;%2006106113 Everett WE Perk ng L06reat15torm Reports%06113 Drainage Report Revised 01.10.06.d" Page 16 of 36 <br />