Laserfiche WebLink
CITY rt RVrRETT - BOARD OF ADJUS.MENT <br />WHEREAS, theretofore, there was filed with the City of <br />Everett Building Division on (date) January 10, 1979 an <br />application for a variance of Section No. 12.060 of Everett <br />Municipal Code Chapter 19 by (applicant) Church of Jesus Christ of Latter <br />Bay Saints <br />(address) ri Riehnrrl Pnwier 10t03 - 23rd Dr. SE Everett, WA 93204 <br />for (specific variance requested) <br />Permission to construct a church with a maximum roof height <br />of thirty-five (35) feet and a steeple with a height of <br />sixty-three (63) feet rather than the code requirement for' <br />height of twenty-five (25) feet. <br />on the following described property: <br />The legal descziption, because of its length, is on fi <br />with the Building Department <br />Approximate Loca'-ion: 9531 - 19th Ave. E (Bothell Way <br />(19th Ave E, & 95th St) <br />Zoning: R-S, Single Family Suburban Residential <br />AND: WHEREAS, (date) February 5, 1979 was fixed as the dat <br />of hearing on said application and proper notice having been give <br />Ui required by law, <br />AND: WHEREAS, a public hearing was held on said date and the <br />Board of Adjustment, after reviewing all testimony, made the fine <br />ings that: <br />The variance request meets all the requirements of <br />Section 19.70.060 of the Everett Municipal Code Paragz <br />1,2,3, & 4. <br />NOW, THEREFORE, based on the foregoing findings: <br />BE IT ORDERED BY THE CITY OF EVERETT BOARD OF ADJUSTMENT that sai <br />application be granted <br />AND: BE IT FINALLY ORDERED that a copy of this written order <br />be transmitted to the applicant for their information. <br />DATE OF ACTION: February 5, 1979 <br />If no building permit has been obtained within one year from the <br />date of this action this order is void. <br />41 <br />Kenneth W. Callahan, Secretary <br />Board of Adjustment <br />