STRUCTURAL STEEL NOTES ELECTRICAL NOL�:
<br />GENERAL NOTES:
<br />1. ALL STEEL WORK SHALL BE PAINTED IN ACCORDANCE
<br />WITH THE PROJECT SPECIFICATIONS AND IN ACCORDANCE
<br />WITH ASTM A36 UNLESS OTHERWISE NOTED.
<br />2. ALL WELDING SHALL BE PERFORMED USING E70XX
<br />ELECTRODES AND WELDING SHALL CONFORM TO AISC AND
<br />AWS D1.1. WHERE FILLET WELD SIZES ARE NOT SHOWN,
<br />PROVIDE THE MINIMUM SIZE PER TABLE J2.4 IN THE AISC
<br />'MANUAL OF STEEL CONSTRUCTION'. PAINTED SURFACES
<br />SHALL BE TOUCHED UP.
<br />3. BOLTED CONNECTIONS SHALL BE ASTM A325 BEARING
<br />TYPE (3/4"0) CONNECTIONS AND SMALL HAVE MINIMUM
<br />OF TWO BOLTS UNLESS NOTED OTHERWISE.
<br />4. NON-STRUCTURAL CONNECTIONS FOR STEEL GRATING MAY
<br />USE 5/8' DIA. ASTM A 307 BOLTS UNLESS NOTED
<br />OTHERWISE.
<br />INSTALLATION OF CONCRETE EXPANSION/WEDGE ANCHOR,
<br />SHALL BE PER MANUFACTURER'S WRITTEN RECOMMENDED
<br />PROCEDURE. THE ANCHOR BOLT, DOWEL OR ROD SHALL
<br />CONFORM TO MANUFACTURER'S RECOMMENDATION FOR
<br />EMBEDMENT DEPTH OR AS SHOWN ON THE DRAWINGS. NO
<br />REBAR SHALL BE CUT WITHOUT PRIOR ENGINEERING
<br />APPROVAL WHEN DRILLING HOLES IN CONCRETE. SPECIAL
<br />INSPECTONS, REQUIRED BY GOVERNING CODES, SHALL BE
<br />PERFORMED IN ORDER TO MAINTAIN MANUFACTURER'S
<br />MAXIMUM ALLOWABLE LOADS,
<br />6. INSTALLATIONS WHERE THE GENSET IS LOCATED NEAR
<br />EXISTING CABLE TRAY SHALL HAVE A NOTE ON THE
<br />DRAWINGS CALLING FOR GRIP STRUT INSTALLATION OVER
<br />THE TRAY FOR TO PROVIDE FOR A WALKWAY FOR TECHS
<br />AND SERVICE PERSONNEL
<br />7, EXISTING PLATFORM INSTALLATIONS SHALL INCLUDE THE
<br />INSTALLATION OF AN ANGLE UNDER THE STRUCTURAL
<br />MEMBER OF THE PLATFORM TO SECURE THE GENSET TO
<br />THE PLATFORM IN LIEU OF THE GATING.
<br />B. SURFACE MOUNTING OF CONDUITS SHALL BE AVOIDED AT
<br />ALL POSSIBLE LOCATIONS WHERE PEDESTRIAN TRAFFIC
<br />CAN OCCUR. WHERE THIS IS UNAVOIDABLE, GRIP STRUT
<br />BRIDGING SHALL BE CALLED OUT FOR INSTALLATION TO
<br />PROTECT THE CONDUITS AND POTENTIAL FOR PERSONNEL
<br />TRIPPING HAZARDS.
<br />1. ALL DETAILS ARE SHOWN IN GENERAL TERMS. ACTUAL
<br />INSTALLATION AND CONSTRUCTION MAY VARY DUE TO SITE
<br />SPECIFIC CONDITIONS.
<br />2. GROUND ALL ANTENNA BASES, FRAMES, CABLE RUNS, AND
<br />OTHER METALLIC COMPONENTS USING GROUND WIRES AND
<br />CONNECT TO SURFACE MOUNTED BUS BARS. FOLLOW
<br />ANTENNA AND BTS MANUFACTURERS PRACTICES FOR
<br />GROUNDING REQUIREMENTS. GROUND COAX SHIELD AT
<br />BOTH ENDS AND EXIT FROM TOWER OR POLE USING MFR'S
<br />PRACTICES.
<br />3. ALL GROUND CONNECTIONS SHALL BE CADWELD. ALL WIRES
<br />SHALL BE COPPER THHN/THWN. ALL GROUND WIRE SHALL
<br />BE GREEN INSULATED WIRE ABOVE GROUND.
<br />4. REFER TO DMSION 16 GENERAL ELECTRIC; GENERAL
<br />ELECTRICAL PROVISION AND COMPLY WITH ALL
<br />REQUIREMENTS OF GROUNDING STANDARDS.
<br />S. RIGID CONDUIT SHALL BE USED WHERE DAMAGE CAN
<br />OCCUR FROM VEHICULAR TRAFFIC OR EQUIPMENT DELIVERY
<br />EXERCISES.
<br />6. ATS AND GENSET LABELS ARE TO BE PROVIDED AND
<br />INSTALLED WITH SERIAL AND CASCADE NUMBERS FOR THE
<br />ATS AND GENSETS. LABELS SHALL BE ATTACHED VIA
<br />JLUMINUM OR SS SCREWS - CONSTRUCTION MANAGER TO
<br />PROVIDE TO SUBS FOR INSTALL AT SITE, DUE TO POSSIBLE
<br />ASSET TRANSFER ACTIVITY, UPON RECEIPT OF LABEL
<br />SPECIFICATION FROM SPRINT/NEXTEL
<br />7, NEW INSTALLATION SHALL BE PVC CONDUIT, USE SCH 80
<br />ABOVE GROUND AND SCH 40 BELOW GROUND. ALSO REFER
<br />TO CONSTRUCTION MANAGER DIRECTION FOR ANY CONDUIT
<br />EXPOSED TO TRAFFIC (VEHICLE OR FOOT).
<br />8. CONTRACTOR TO PROVIDE A NEW fib BLOCK IF REQUIRED,
<br />WITH FURTHER ROUTING TO THE RBS EQUIPMENT CABINET
<br />AND LEFT WITH A 2' COIL OF WIRE:. ALARM CABLING IN
<br />THE TELCO CABINET SHALL BE INSTALLED IN A NEAT
<br />FASHION WITH A 6' SERVICE COIL. CONTRACTOR SHALL
<br />NOT MAKE PUNCH DOWNS ON THE TELCO BOARD 66
<br />BLOCK
<br />THE SPRINT/NEXTEL METHOD OF PROCEDURE (MOP) MOPS
<br />2061108 INSTALLATION OF PAD MOUNTED GENERATOR SETS
<br />15 THE BASIS FOR ALL TECHNICAL INSTALLATION
<br />SPECIFICATIONS; AND IN THE EVENT THERE IS A CONFLICT
<br />BETWEEN THESE CONSTRUCTION DOCUMENTS OR THE
<br />INSTALLATION CHECKLIST AND THE GENSET MOP, THE
<br />CONTRACTOR SHALL FOLLOW THE DIRECTIVE DESCRIBED
<br />WITHIN THE MOP AND CONTACT CONSTRUCTION MANAGER TO
<br />APPRISE. EYCEPT NO PORTABLE GENERATOR S/0 CORD
<br />STILL BE REMOVED
<br />2. DRAWINGS ARE NOT TO BE SCALED, WRITTEN DIMENSIONS
<br />TAKE PRECEDENCE, THIS SET OF DOCUMENTS IS INTENDED
<br />TO BE USED FOR DIAGRAMMATIC PURPOSES ONLY, UNLESS
<br />NOTED OTHERWISE. THE GENERAL CONTRACTOR'S SCOPE OF
<br />WORK SHALL INCLUDE FURNISHING ALL MATERIALS.
<br />EQUIPMENT, LABOR, AND ANY REOL':.^.EMENTS DEEMED
<br />NECESSARY TO COMPLETE INSTALLATION AS DESCRIBED IN
<br />THE DRAWINGS AND OWNER'S PROJECT MANUAL.
<br />3. THE PROPOSED FACILITY WILL BE UNMANNED AND DOES
<br />NOT REQUIRE POTABLE WATER OR SEWER SERVICE.
<br />4. THE PROPOSED FACILITY IS UNMANNED AND IS NOT FOR
<br />HUMAN HABITAT. (NO HANDICAP ACCESS IS REQUIRED).
<br />5. INFORMATION SHOWN ON THESE DRAWINGS WAS OBTAINED
<br />FROM SITE VISITS AND DRAWINGS PROVIDED BY THE SITE
<br />OWNER. DRAWINGS WERE PREPARED FROM SITE SPECIFIC
<br />DETAILS AND STANDARDIZED DETAILS DEVELOPED BY PACIFIC
<br />TELECOM SERVICES, LLC. STANDARDIZED DETAILS ARE TO BE
<br />CONFIRMED AND CORRELATED AT THE SITE BY THE
<br />CONTRACTOR. THE CONTRACTOR SHALL FIELD VERIFY ALL
<br />DIMENSIONS. MODIFICATIONS DUE TO FIELD CONDITIONS
<br />MUST BE SUBMITTED TO, AND APPROVED BY,
<br />SPRINT/NEXTEL PRIOR TO ORDERING MATERIAL OR
<br />PROCEEDING WITH CONSTRUCTION.
<br />6. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY
<br />DAMAGE CAUSED BY THE CONSTRUCTION OPERATION.
<br />7. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL
<br />PERMITS AND INSPECTIONS REQUIRED FOR CONSTRUCTION.
<br />8. CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM
<br />THE SITE ON A DAILY BASIS. ALL INSTALLATIONS SHALL BE
<br />100% CLEAN OF ALL DEPRIS AND METAL FILINGS SHALL BE
<br />REMOVED FROM ENCLOSURES, SITE AREA, FIXTURES,
<br />PLATFORMS, ETC.
<br />9. PRIOR TO THE SUBMISSION OF BIDS, CONTRACTORS
<br />INVOLVED SHALL VISIT THE JOB SITE TO FAMILIARIZE
<br />THEMSELVES WITH ALL CONDITIONS AFFECTING THE
<br />PROPOSED PROJECT. CONTRACTORS SHALL VISIT THE
<br />CONSTRUCTION SITE WITH THE CONSTRUCTION/CONTRACT
<br />DOCUMENTS 10 VERIFY FIELD CONDITIONS AND CONFIRM
<br />THAT THE PROJECT WILL BE ACCOMPLISHED AS SHOWN.
<br />PRIOR TO PROCEEDING WITH CONSTRUCTION, ANY ERRORS,
<br />OMISSIONS, OR DISCREPANCIES SHALL BE BROUGHT TO THE
<br />ATTENTION OF THE ARCHITECT/ENGINEER VERBALLY AND IN
<br />WRITING.
<br />10. THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN
<br />AUTHORIZATION TO PROCEED WITH CONSTRUCTION PRIOR TO
<br />STARTING WORK ON ANY ITEM NOT CLEARLY DEFINED BY
<br />THE CONSTRUCTION DRAWINGS/CONTRACT DOCUMENTS.
<br />11, THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE
<br />PROJECT DESCRIBED IN THE CONTRACT DOCUMENTS. THE
<br />CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL
<br />CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES,
<br />AND PROCEDURES FOR COORDINATING ALL PORTIONS OF
<br />THE WORK UNDER THE CONTRACT.
<br />12. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND
<br />MATERIALS ACCORDING TO MANUFACTURER'S/VENDCR'S
<br />SPECIFICATIONS UNLESS NOTED OTHERWISE OR WHERE
<br />LOCAL CODES OR ORDINANCES TAKE PRECEDENCE.
<br />13, ALL WORK PERFORMED ON THE PROJECT AND MATERIALS
<br />INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL
<br />APPLICABLE CODES, REGULATIONS, AND ORDINANCES.
<br />CONTRACTOR SHALL GIVE ALL NOTICES AND COMPLY WITH
<br />ALL LAWS, ORDINANCES, RULES, REGULATIONS AND
<br />LAWFUL ORDERS OF ANY PUBLIC AUTHORITY, MUNICIPAL
<br />AND UTILITY COMPANY SPECIFICATIONS, AND LOCAL AND
<br />STATE JURISDICTIONAL CODES BEARING ON THE
<br />PERFORMANCE OF THE WORK.
<br />14. THE STRUCTURAL COMPONENTS OF ADJACENT
<br />CONSTRUCTION OR FACILITIES ARE NOT TO BE ALTERED
<br />BY THIS CONSTRUCTION PROJECT UNLESS NOTED
<br />OTHERWISE.
<br />15. SEAL ALL PENETRATIONS THROUGH FIRE -RATED ARLAS
<br />WITH U.L. LISTED OR FIRE MARSHALL APPROVED
<br />MATERIALS IF APPLICABLE TO THIS FACILITY AND OR
<br />PROJECT SITE.
<br />16. CONTRACTOR TO PROVIDE A PORTABLE FIRE EXTINGUISHER
<br />WITH A RATING OF NOT LESS THAN 2-A OR 2-A1OBC
<br />WITHIN 75 FEET TRAVEL DISTANCE TO ALL PORTIONS OF
<br />PROJECT AREA DURING CONSTRUCTION.
<br />17. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO
<br />PROTECT EXISTING IMPROVEMENTS, EASEMENTS, PAVING,
<br />CURBING, ETC. DURING CONSTRUCTION. UPON COMPLETION
<br />OF WORK, CONTRACTOR SHALL REPAIR ANY DAMAGE THAT
<br />MAY HAVE OCCURRED DUE TO CONSTRUCTION ON OR
<br />ABOUT THE PROPERTY.
<br />18. THE ARCHITECTS/ENGINEERS HAVE MADE EVERY EFFORT
<br />TO SET FORTH IN THE CONSTRUCTION AND CONTRACT
<br />DOCUMENTS THE COMPLETE SCOPE OF WORK.
<br />CONTRACTORS BIDDING THE JOB ARE NEVERTHELESS
<br />CAUTIONED THAT MINOR OMISSIONS OR ERRORS IN THE
<br />DRAWINGS AND OR SPECIFICATIONS SHALL NOT EXCUSE
<br />SAID CONTRACTOR FROM COMPLETING THE PROJECT AND
<br />IMPROVEMENTS IN ACCORDANCE WITH THE INTENT OF
<br />THESE DOCUMENTS. THE BIDDER SHALL BEAR THE
<br />RESPONSIBILITY OF NOTIFYING (IN WRITING) THE
<br />ARCHITECT/ENGINEER OF ANY CONFLICTS, ERRORS, OR
<br />OMISSIONS PRIOR TO SUBMISSION OF CONTRACTOR'S
<br />PROPOSAL. IN THE EVENT OF DISCREPANCIES THE
<br />CONTRACTOR SHALL PRICE THE MCRE COSTLY OR
<br />EXTENSIVE WORK, UNLESS DIRECTED OTHERWISE.
<br />19. THE CONTRACTOR SHALL PERFORM WORK DURING
<br />OWNER'S PREFERRED HOURS TO AVOID DISTURBING
<br />NORMAL BUSINESS.
<br />20. CONTRACTOR SHALL CALL WASHINGTON UTILITY
<br />COORDINATING COUNCIL SERVICE FOR UNDERGROUND
<br />UTILITY MARKOUT PRIOR TO CONSTRUCTION
<br />1-800-424-5555.
<br />21. IN CASE O' CONFLICT BETWEEN THE AFORE REFERENCED
<br />SPRINT/NEXTEL STANDARDS AND INSPECTION CHECK LIST,
<br />THE GENERAL CONTRACTOR SHALL CONTACT
<br />CONSTRUCTION MANAGERS' PROJECT MANAGER TO
<br />RESOLVE, IN WRITING, ANY DEVIATIONS.
<br />Together with NEXTEL
<br />PACIFIC TELECOM SERVICES,
<br />LLC
<br />4072
<br />THOMAS R. F"ND
<br />SATE OF W'ASHW=TOM 1
<br />l �
<br />Q
<br />G-171
<br />GENERAL NOTES
<br />JOB /
<br />DRAWING
<br />-4"
<br />G-t
<br />REVISION1 0