Laserfiche WebLink
PROJECT OVERVIEW <br />The proposed development of the Alfy's Pizza site is located on a parcel of <br />approximately 1.20 acres in south Everett. It lies west of 19th Avenue and just north <br />of the existing Skate Deck. (See Exhibits "A" & "B".) <br />Currently, the site is undeveloped with extensive existing fill. It is vegetated by sparse <br />grass with much of the site exposed bare earth. The parcel slopes from east to west at <br />approximately 3% and outfalls to an existing drainage way within an existing 20' <br />easement. The drainage course continues westerly to a larger northerly course at the <br />Interstate 5 right of way. <br />Development of the site :s proposed to consist of approximately 8,000 s.f. of restaurant <br />space with 68 parking spaces and asphalt pavement drive to provide access and <br />circulation within the site. This report addresses the collection, conveyance, <br />biofiltration and detention of drainage runoff from the developed site. <br />COLLECTION AND CONVEYANCE <br />Runoff from the developed site will be collected and conveyed primarily as sheet flow <br />to the northwest comer of the parking lot. The paved surfaces and landscaped areas <br />will be collected by catch basins constructed adjacent to the north curb line of the <br />entrance driveway. Flows from the roofs will be discharged directly to the most <br />easterly catch basin. <br />The lower end of the conveyance system shall be oversized pipes to accorr, modate <br />detention requirements as an underground tank. The detention facility will discharge to <br />the biofiltration swale for low flows and through the high flow bypass for larger storm <br />events. <br />Both the biofiltration swale and the high flow bypass will discharge to a new piping <br />system constructed within the 30 foot easement. Final outfall from the system will be <br />into an energy dissipater of 6 to 8 inch quarry spalls at the edge of the existing <br />northerly drainage course to the west of the site. <br />BIOFILTRATION <br />In accordance with City of Everett design criteria of 100 feet plus 1 foot for every 400 <br />s.f. over 10,000 s.f. of asphalt paving surface, the project requires a minimum of 160 <br />lineal feet of biofiltration Swale. The design proposes to construct the 160 lineal feet of <br />swale adjacent to the west boundary of the site. <br />DETENTION SYSTEM <br />According to City of Everett design criteria, the proposed project will require 1,526 <br />cubic feet of detention to attenuate runoff flows from the developed site prior to <br />discharge to the existing drainage course. (For Detention Calculations, see Appendix <br />"A'.) <br />The detention system is designed to consist of 48 inch diameter CMP with a capacity of <br />1,530 cubic feet. <br />