Laserfiche WebLink
� <br />I� <br />� <br />� <br />� <br />� <br />! <br />� <br />1.8 OTI�iER PERMIT�: <br />The application is for commercial development as such it ;s required to do <br />through the following review process: <br />1. SEPA Review. <br />2. Site Plan Review <br />3. Engineering Revie�v <br />4. Building and Architectural Review. <br />Upon issuance of the SEPA Mitigated Decision of Non-Significance a.nd che <br />expiration of the appeal peiiod, the applicant v!ill submit the full engineering <br />and building design pack�+t in order to receive the Building Pe�-mit and <br />Utilities Nook-up approval per City of Everett requirements. The applicant <br />does not anticipate any otner permits that ��ill be required of hirr� at this <br />rime. <br />