Laserfiche WebLink
development. The additional open cell and underground pipe should be installed at the <br />same elevation as the Burger King side in order to match the stage storage discharge <br />relationship of the Burger King system. The piped orifice system controlled orifice is <br />sized to accommodate the final developed flow volumes and release rates. No <br />modifications of the orifice is necessary when the Les Schwab site is developed. The <br />consequence of no development or a smaller amount of impervious are on the northern <br />portion of the site will only reduce the peak outlet flows from the site. <br />96-016 6 Two Rivera Engine nng <br />