Laserfiche WebLink
PROJECT MEMORANuu,�t <br />To: Mulvaney Partnership (Chandler) <br />From: Mechanical Systems Engineering, Inc. (Cary Novotny) <br />Phone: (206) 241-5831 Fax: (206) 241.6033 <br />Project No.:B400 <br />Subject: Home Base, Everett <br />Dale: 16 December, 1997 <br />Chandler, <br />The envelope UA calculations for the Home Base in Everett comply with the energy code under the <br />following conditions and assumptions: <br />1.) The vertical glazing located at the front entrance and the greenhouse shall be double <br />glazing with a standard W air space and a maximum U-value of 0.75. <br />2.) All exterior metal doors than be insulated. <br />3.) The bait insulation in the roof assembly shall have an R-value of 23. <br />4.) All exterior 8" CMU walls shall be filled with vermiculite. <br />5.) The slab on grade does not need to be insulated and is assumed to be unheated. <br />In addition to these conditions, it is recommended that you have catalog cut sheets available for the <br />skylights and the smoke vents. The energy department will more then likely be interested in where those <br />U-values came from. <br />Please feel free to call me if you have any questions. <br />END OF MEMORANDUM <br />