My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9900 19TH AVE SE 2018-01-02 MF Import
>
Address Records
>
19TH AVE SE
>
9900
>
9900 19TH AVE SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 12:22:14 PM
Creation date
4/2/2017 3:12:01 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9900
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />COST ESTIMATE SHEET <br />Public Works Department <br />Utilities Division, 3200 Cedar Street <br />Everett, Washington 98201 <br />(425) 257-8800 <br />Receipt # /3 �/, o 2- Date Paid <br />X Cost of Work Order 9,830.00 Work Order # <br />Cost of Service Order Service Order # <br />Contact Person Mary Keating Telephone # 425-338-5702 <br />Requested Gordon Witcher Date of Request 4-22-98 <br />Property Owner (name) w ; ,moo t�1e tease z: <br />Charge Cost to (name if different than owner) Dave Michaelis Co. <br />Address 1430 E McAndrews Rd, #1 City Medford, OR Zip 97504 <br />Installation Location 9900 -19th Ave SE- Everett 98201 <br />Installation type/description/size/etc. Expose 16" water main on 100th St. Wet tap 2-8" valves- remove <br />DDCA after purity and make final connections. <br />® The following estimate is based upon the Utilities Division providing all labor, equipment, materials, <br />restoration, and final hook-up. <br />❑ The following estimate is based upon the Street Division work group providing all labor, equipment, materials <br />and restoration to property. <br />Please notify the City of Everett Utilities Division 10 working days in advance of required installation date <br />to allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall _)e charged to the property for which such installation was made and the owner <br />thereof, and provided further, that any excess payment shall be returned to the person applying for the installation. <br />*Deposit must be paid prior to ordering parts or scheduling work. <br />Labor & Benefits <br />Material <br />Equipment Rental <br />Surface Restoration <br />TOTAL <br />5,400.00 <br />2,410.00 <br />2,020.00 <br />$9,830.00 <br />cc: Bldg. Permit Center <br />Clair Olivers <br />Tom Thetford <br />Kirk Brooks <br />Gordon Witcher <br />Dan Lowell <br />Stan Mitchell <br />Paul McKee <br />Gerry Crum <br />Alan Locke <br />Prepared by: Garza Date Est. <br />Accepted by Prepared: Representing: Aet,t s <br />4-22-98 i�T we ie S <br />ESTIMATE GOOD FOR 6 MONTHS <br />COSTAGND:IG365cst(LM4/23l98) <br />
The URL can be used to link to this page
Your browser does not support the video tag.