My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9900 19TH AVE SE 2018-01-02 MF Import
>
Address Records
>
19TH AVE SE
>
9900
>
9900 19TH AVE SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 12:22:14 PM
Creation date
4/2/2017 3:12:01 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9900
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Issued By CSG <br />Issued DepartmentPw <br />Date Issue.. 9/10/2010 <br />Fund 401 <br />Program <br />Work Activity Work Order <br />CAVANAH, SHANE G. <br />PUBLIC WORKS <br />Accounts Program 710 <br />Title REPAIR 8 INCH 9900 19TH AVE SE 710119673 <br />Work Order No 20102402 Project <br />Status 9/1o/2oto Time 0657 Original WO <br />Completed By Time <br />Page 2 <br />9/29/2010 11:08 <br />Function 119 Activity 673 <br />Activity Type CORRECTIVE MAINTENANCE Status CL <br />Problem Details <br />BILL JOB. CONTRACTOR POKED HOLE IN MAIN. IT WAS IN THE WAY <br />OF A DRAINAGE LINE THEY WERE INSTALLING. THE CONTRACTOR HAD <br />CITY OF EVERETT LOWER THE MAIN FOR THEIR DRAINAGE LINE. <br />BILL TO WINCO FOODS- PO BOX 5756 BOISE IDAHO 83705. <br />Structure ID St[IM Activity <br />WML1885Z02 WAMAIN <br />Follow Up? <br />Compl Date Comments <br />YES 9/10/2010 <br />Address 9900 19TH AVE SE <br />Cross Street <br />Area Designator Structure Location <br />Map Reference <br />Location <br />Vehicle Costs <br />Type Vehicle No Description Hours Cost Billing Date Billing Code Warehouse <br />V J0049 2000 FORD 1 112 TON SERVICE TR 4 44.4 0910912010 <br />V J0067 2003 FORD DUMP TRUCK 4 67.2 09/09/2010 <br />Total Vehicle Cost $111.60 <br />Material Costs <br />Type Mater No Description Quantity Cost Billing Date Billing Code Warehouse <br />M COUP46047147 COUPLING 8 MJ X 3 MJ DI SLEEVE 1- 71.264 09109I2010 PAN <br />--- <br />M ELL046042247 ELBOW 8 MJ 22-1/2 DEG DI (1/16 4 321.544 09/092010 PAN <br />M MEGA46044347 MEGALUG 8 KIT 10 420.22 09/09/2010 PAN <br />M PIPE46055047 PIPE 8 TYTON JOINT DI CLASS 52 10 186.01 09/09/201 PAN <br />Total Material Cost 5999.03 <br />Personnel Costs <br />Type ID Name Hours Cost Billing Date Earning Code Class <br />P ASP <br />P Bic <br />P BBA2 <br />P WDL <br />ANDERSON. SHAN P. <br />4 72.448 <br />BOHNERT, JAMES C. <br />4 116.692 <br />BPIGHTWELL, BILLY A <br />4 79.8 <br />WEAVER, DEAN L. <br />4 119.448 <br />Total Personnel Cost <br />E388.59 <br />Total Cost $1,499.02 <br />09/09/2010 <br />09/0912010 <br />09/092010 <br />09/0912010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.