Laserfiche WebLink
As far as I know, our electrical contractor has not picked up the <br />electrical permit. However, if the permit has been picked up, I <br />would also need it extended. <br />At this time, I expect to be under construction by the end of <br />January. with a scheduled completion date some time in April. <br />Finally, please feel free to contact me if you should have any <br />questions. <br />